My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> Exhi�� 90 ' <br /> are intended to promote alternative modes of transportation in the DPP area, <br /> emphasizing pedestrian and bicycle travel and a reduction in the number of <br /> vehicle miles traveled within and by residents of the City. The PED policies do <br /> so by, among other things, slowing traffic and enhancing pedestrian and bicycle <br /> infrastructure to ensure that the City`s DPP street network facilitates safe and <br /> convenient pedestrian and bicycle travel. The removal of the sidewalk on <br /> Jefferson Avenue would conflict with these policies by decreasing pedestrian <br /> infrastructure. Moreover, as explained above with regard to Impact 9-2, the New <br /> General Plan contains additional policies and programs pursuant to which the City <br /> will no longer rely on specific LOS measurements to determine the significance <br /> of a project's potential traffic impacts in the downtown area, and pursuant to these <br /> new LOS Policies and programs, this potential cumulative impact could be <br /> considered less than significant. Assuming, however, that this identified traffic <br /> increase represents a patentially significant cumulative impact, because <br /> implementing Mitigation Measure 9-2 would conflict with the City's PED <br /> policies, and because the improvements required by this mitigation measure are <br /> not within the City's jurisdiction, this mitigation measure is deemed infeasible, <br /> and this impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures avaiiable to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP ovenide the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations beiow. <br /> Impact 9-12: Cumulative Impact on Main Street/Woodside Road <br /> Westbound Ramps Intersection. Under Cumulative With Project Conditions during <br /> both the AM and PM peak hour, this intersecYion would continue to operate at an <br /> unacceptable LOS F. The additional project traffic would cause the critical delay to <br /> increase by more than five (5) seconds, plus the peak hour signal warrant. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> an pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-3 as discussed under Impact 9-3, above. <br /> However, as noted above, the improvements proposed by Mitigation Measure 9-3 <br /> are within the responsibility and jurisdiction of Caltrans, and can and should be <br /> adopted by Caltrans. Because implementation of this mitigation measure is <br /> outside of the City's jurisdiction, it is deemed infeasible and therefore this impact <br /> is deemed to be significant and unavoidable. <br /> S:\RESQLUTIONS\Reso. 2U92 CEQA Findings for DPP Eahibit B.doc 30 <br /> 012011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.