Laserfiche WebLink
8.0 <br /> ExhiB�� 91 <br /> ecause there are no feasible miti ation <br /> ii Remainin Im acts. B � <br /> () g P <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii} Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9-13: Cumulative Impact on Middlefield Road/Jefferson Avenue <br /> Intersection. Under Cumulative With Project Conditions during the PM peak hour, <br /> this intersection would degrade fram LOS E to LOS F. The additional project <br /> traf�c would cause the critical delay to increase by more than five (5} seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of the project contribution <br /> to this cumulative impact could be achieved through Mitigation Measure 9-13 <br /> (pages 9-67 to 9-68 of the DEIR) which would require the restriping of the <br /> southbound approach of Middlefield Raad to provide one through lane and one <br /> right turn lane, and prohibit southbound left turns (from Middlefield Road to <br /> Jefferson Avenue, towards Broadway). With this improvement, the intersection <br /> would continue to operate at an unacceptable LOS, but the change in the critical <br /> delay from Cumulative Without Project Conditions would be reduced to less than <br /> five (5) seconds, a less than significant level. However, these improvements <br /> would conflict with newly adopted PED policies contained in the City's New <br /> General Plan. PED policies are intended to promote alternative modes of <br /> transportation in the DPP area, emphasizing pedestrian and bicycle travel and a <br /> reduction in the number of vehicle miles traveled within and by residents of the <br /> City. The PED policies do so by, among other things, slowing traffic and <br /> enhancing pedestrian and bicycle infrastructure to ensure that the City's DPP <br /> street network facilitates safe and convenient pedestrian and bicycle travel. The <br /> improvements would conflict with these policies by impeding pedestrian mobility. <br /> In addition, as explained above, the Ne�� General Plan contains additional policies <br /> and programs pursuant to which the City will no longer rely on specific LOS <br /> measurements to determine the significance of a project's potential traffic impacts <br /> in the downtown area, and pursuant to these new LOS Policies and programs, this <br /> potential cumulative impact could be considered ]ess than significant. Assuming, <br /> however, that this identified traffic increase represents a potentially significant <br /> cumulative impact, because implementing Mitigation Measure 9-13 would <br /> conflict with the City's PED policies, this measure is deemed infeasible, and this <br /> impact is deemed to be significant and unavoidable. <br /> S'1RLSOLUTIONS\Reso. 2092 CEQA Findings For DPP E�:hibit B.doc -� I <br /> OI2011 <br />