My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 D <br /> Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> January 24, 2011 <br /> SUBJECT <br /> Award of Contract — Sanitary Sewer and Storm Replacement Project (Manzanita St., <br /> Shasta St., Spruce St., Heller St., and Pine St.) <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Sanitary Sewer and Storm Replacement Praject to Robert F. Enz Construction, Inc. <br /> of Hollister, California for their responsive and responsible low bid of $1,116,405.00 <br /> and authorize the City Manager to increase the contract amount, if necessary, up to <br /> 10% of the amount awarded. <br /> BACKGROUND <br /> The city systematically replaces sections of aging infrastructure to ensure the continued <br /> reliability of the system. Each year, staff from Building, Inftastructure and <br /> Transportation and Public Works Services departments identify pipelines that required <br /> excessive maintenance or experienced repeated service disruptions and target those <br /> pipelines for improvement. <br /> The city completed the Sewer Master Plan in 2008 which evaluated the viability of the <br /> collection system based on capacity limitations. Thirteen (13) replacement projects <br /> (approximate total cost $38 million over the next decade based on estimates conducted <br /> in 2008) are currently identified by the master plan to mitigate existing capac'rty <br /> limitations during peak wet weather flows. The proposed sanitary sewer replacement <br /> project is identified as Priority 1 in the Sewer Master Plan and will relieve the <br /> "bottleneck" and improve the condition of the coll"ection system. <br /> The project will replace approximately 1,558 linear feet of 6-inch vitrified clay pipe (VCP) <br /> sewer main with new 8-inch polyvinyl chloride pipe (PVC), 616 linear feet of 12-inch <br /> VCP sewer main with new 18-inch PVC, and 1,717 linear feet of 16-inch VCP sewer <br /> main with new 18-inch PVC. <br /> The storm drain project is included in the same package because the project is within <br /> the same vicinity as the sanitary sewer replacement project. The proposed <br /> improvement is designed to alleviate ponding of storm water on Shasta Street. <br /> Twelve (12) bids were received at the bid opening on January 5, 2011 and are <br /> summarized below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.