Laserfiche WebLink
6.1 D <br /> Page 3 <br /> St.) meets the CEQA exemption criteria as set forth in Section '15302, ("Replacement or <br /> Reconstruction"). Furthermore, this project has been designed compliant with the city's <br /> Engineering Standards and accepted landscape architectural practices. � <br /> � J <br /> �� ' , <br /> Ji my Tan, PE S. eter Vorametsanti, PE, PTOE, CFM <br /> Senior Civil Engineer Ci#y Engineer <br /> / 2 , � i <br /> Chu Chang, PE, LEED AP obert B. Bell <br /> CDS Manager Interim City Manager <br /> Engineering and Transportation <br /> ATTACHMENTS <br /> Project Location Map <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> 1. Contract Documents <br /> 2. Bid Documents <br />