My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Cal-West Lighting and Signal Maintnece Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Cal-West Lighting and Signal Maintnece Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 12:33:11 PM
Creation date
2/22/2011 4:31:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Cal-West Lighting and Signal Maintnece Inc.
PROJECT NAME
Electiical Maintenance Project 2011
RMP File Number
304
Date
2/22/2011
MO Ref
11-014 12-062
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> TASK 1 — TRAFFIC SIGNAL MAINTENANCE AND REPAIR <br /> 1- All labor, tools, equipment, materials necessary to properly maintain the <br /> Traffic Signals owned by the City. <br /> 2 - Preventative Maintenance (PM): The Contractor will provide pricing for Option <br /> A and Option B in Chapter 6 (Proposal Cost) of their submitted Proposal. <br /> Option A is made up of a Monthly PM, Semi - Annual PM, and Annual PM. <br /> Each month, the Contractor will perform the Monthly PM. Twice a year the <br /> Contractor will perform the Semi - Annual PM which includes the Monthly PM. <br /> Once a year, the Contractor will perform the Annual PM which includes the <br /> Semi - Annual PM, and Monthly PM. <br /> Option B is made up of a Quarterly PM, Semi - Annual PM, and Annual PM. <br /> Each quarter, the Contractor will perform the Quarterly PM. Twice a year the <br /> Contractor will perform the Semi - Annual PM which includes the Quarterly PM. <br /> Once a year, the Contractor will perform the Annual PM which includes the <br /> Quarterly PM and Semi - Annual PM. <br /> Attachment F shows a Calendar of Expected Costs assuming Option A <br /> (Monthly PM). <br /> Attachment G shows a Calendar of Expected Costs assuming Option B <br /> (Quarterly PM). <br /> Monthly or Quarterly PM <br /> On a monthly or quarterly basis, Contractor will perform the following PM <br /> inspection and complete repairs as necessary. <br /> a. Inspect Signal Controller and Cabinet Contents for proper functioning to <br /> include: <br /> 1. Check general overall appearance of Controller Cabinet, Type 3 <br /> Service and Battery Back -Up Cabinets (vacuum if necessary). <br /> 2. Check presence of Signal Cabinet Wiring Schematics and Records. <br /> 3. Verify current Signal Controller Timing Logs. <br /> 4. Verify that Programmed Signal Controller Timing matches <br /> Intersection Timing Logs. <br /> 5. Verify that Signal Controller and Conflict Monitor function in relation <br /> to traffic. <br /> 6. Inspect Loop Detector Amplifiers (tune if necessary). <br /> 7. Inspect Video Detection Unit / Camera Alignment (if applicable). <br /> 8. Load Switches and Relays. <br /> S:ATTY /AGR/2011.008 ELECTRIC MAINTENANCE AGREEMENT <br /> 012811 <br /> 101Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.