My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Cal-West Lighting and Signal Maintnece Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Cal-West Lighting and Signal Maintnece Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 12:33:11 PM
Creation date
2/22/2011 4:31:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Cal-West Lighting and Signal Maintnece Inc.
PROJECT NAME
Electiical Maintenance Project 2011
RMP File Number
304
Date
2/22/2011
MO Ref
11-014 12-062
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. Light Switches and Ground -Fault Receptacles. <br /> 10. Inspect Cabinet Fan and Thermostat. <br /> 11. Inspect Battery Back -Up Unit charging system (if applicable). <br /> 12. Inspect Pre - emption System. <br /> 13. Inspect Signal Interconnect. <br /> 14. Wire terminals for corrosion and integrity of all wire connections <br /> (including BBS battery terminals). <br /> 15. Inspect Ground Rod and Grounding System for corrosion and <br /> ensure integrity of wire connections. <br /> 16. Inspect Cabinet Filter for cleanliness and serviceability (clean or <br /> vacuum if necessary). <br /> 17. Weather -proof gasket on Controller Cabinet and all other <br /> associated Cabinets. <br /> 18. Inspect Door Lock operation. <br /> b. Inspect Intersection for proper functioning to include: <br /> 1. Inspect Vehicular Signals for alignment, paint, outages, bent, <br /> broken, or corroded hardware. <br /> 2. Insect Pedestrian Signals and Audibles for alignment, paint, <br /> outages, bent, broken, or corroded hardware. <br /> 3. Inspect Pedestrian Push - Buttons for Signal Controller actuation and <br /> bent, broken, or corroded hardware. <br /> 4. Inspect Signal Poles for paint, dents, or cracks and missing hand <br /> hole covers. <br /> 5. Inspect pull boxes for cracked, broken, or missing lids. Check <br /> condition of splices. <br /> 6. Inspect Loops in Roadway for exposed, torn, or broken wires. <br /> c. Record Date and Time along with findings and work performed. <br /> Semi- Annual PM <br /> On a semi - annual (every 6 months) basis, Contractor will perform the Monthly <br /> or Quarterly PM as well as the Semi - Annual PM and complete repairs as <br /> necessary. Listed below is the Semi - Annual PM inspection list. <br /> 1. Rotate Back -Up Batteries. <br /> 2. Take voltage measurements from Back -Up Batteries by performing <br /> Battery Load -Test. <br /> 3. Test Battery Back -Up by disconnecting PG &E power at service <br /> cabinet. <br /> 4. Check ground rod clamp and wire. <br /> 5. Visually check integrity of wire splices. <br /> 6. Adjust all mast arm mounted street name signs as needed. <br /> 7. Record Date and Time along with findings and work performed. <br /> Annual PM <br /> S:ATTY /AGR/2011.008 ELECTRIC MAINTENANCE AGREEMENT <br /> 012811 <br /> 111Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.