My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Pacific Electric Contracting Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Pacific Electric Contracting Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 1:09:02 PM
Creation date
3/7/2011 1:08:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Electric Contracting Inc.
PROJECT NAME
Emergency Vehicle Preemption Project (2010) Jefferson Avenue-Marshall Street, Redwood City
RMP File Number
304.5
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M. The terminal strips shall have protective barriers between each terminal. The terminal screws <br /> shall be captive and equipped with wire grips for wire up to No. 8. All components shall be pre - <br /> wired to a single strip assuring that field connections are made to clearly identified line terminals. <br /> N. Prior to energizing luminaries, the Tamp socket should be checked to assure that it is set in the <br /> proper location for the required Tight distribution in accordance with the manufacturer's <br /> instructions, and the luminaries shall be tilted five degrees (5°) above the horizontal. <br /> O. The supplier shall submit copies of certified tests to substantiate the satisfactory performance of <br /> the luminaries under 100 mph winds. <br /> P. A fused disconnect shall be furnished inside the luminaries so that when the door is opened the <br /> ballast primary circuit is broken, thereby allowing the fixture to be serviced without shock hazard. <br /> Q. Door frame shall be extruded aluminum construction hinged with stainless steel pins and be <br /> removable by means of quick release safety latch. <br /> R. Lens shall be of clear, thermal, and impact tempered glass of 0.156" minimum thickness, sealed <br /> with a gasket of heat resistant polypropylene. <br /> S. Ballast shall be open core -coil capacitor and starter type, high power factor type, suitable for <br /> starting lamp to -20°F. <br /> T. Ballast shall be mounted within the luminaries on a separate extruded aluminum panel having <br /> fins for heat dissipation with quick - release fasteners so that ballast assembly may be removed <br /> and replaced as a unit. <br /> U. Lamp holder shall be the mogul base ceramic type 5 KV pulse rated, having nickel - plated screw <br /> shell and contacts, reflector seal shall be airtight. <br /> V. All electrical components shall be rated for 240 volt single -phase two wire with insulation rated at <br /> 600 volts. <br /> 2.10 STANDARDS, STEEL PEDESTALS AND POSTS <br /> A. Standards for traffic signals and lighting, and steel pedestals for cabinets and other similar equipment <br /> shall be located as shown on the plans, and shall conform to the provisions of Section 86 -2.04 <br /> "Standards, Steel Pedestals, and Posts" of the Standard Specifications and these specifications. <br /> B. Reference is made to Section 86 -7 "Removing, Reinstalling or Salvaging Electrical Equipment" of the <br /> Standard Specifications. Salvaged material not reused shall be delivered to the Redwood City Municipal <br /> Services Center located at 1400 Broadway, Redwood City, California. The cost of this shall be <br /> considered in the lump sum of the work item involved and no addition compensation will be allowed <br /> therefore. <br /> C. All anchor bolts shall be galvanized steel and lightly greased prior to installation of the pole. <br /> D. All required drilling of poles shall be done in the field after the pole is mounted. <br /> E. Where the plans refer to the side tenon detail at the end of the signal mast arm, the applicable tip tenon <br /> detail may be substituted. <br /> F. The contractor shall either install a 3/16 inch or larger brass bolt on each existing standard for bonding, or <br /> preferably to be provided by pole manufacturer on the side of pole adjacent to hand -hole. The bolt shall <br /> be installed on the outside of the shaft near the baseplate where it is to be covered by the bolt cover. The <br /> shaft of the standard shall be drilled for no larger than a 1/4 inch hole near the baseplate to provide <br /> passage for the bonding conductor. <br /> 2.11 SERVICE PEDESTALS <br /> A. Type III CF service equipment enclosures shall be fabricated from aluminum and shall conform to the <br /> fabrication requirements in Section 86 -2.11, "Service ", of the Standard Specifications except as follows: <br /> 1. All exterior seams for enclosure and doors shall be continuously welded by the gas tungsten arc <br /> (TIG) process. <br /> 2. Sealing of the anodic coating shall be in a five (5) percent aqueous solution of nickel acetate (PH <br /> 5.0 to 6.5) for 15 minutes at 210 °F. <br /> SIGNALS LIGHTING AND ELECTRICAL SYSTEMS 16500 -6 <br /> EMERGENCY VEHCILE PREEMPTION PROJECT 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.