My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-03-21
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 1:17:21 PM
Creation date
3/17/2011 2:52:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 B <br /> Page 17 <br /> � <br /> Quality Control Procedures <br /> The City of Redwood City will be �uaranteed the highest quality and accurate data, a standard <br /> Davey Resource Group always follows. Included in this data will be GPS coordinates that <br /> demonstrate submeter accuracy. DRG will provide extensive quality control information with <br /> the following processes to ensure that the quality expectations are met and exceeded: <br /> • Training — Quality control is intended to assure quality data. The first step in DRG's <br /> quality control is to provide proper training of qualified individuals to create quality data <br /> from the start. Our field personnel will be ISA Certified Arborists with cunent <br /> certification. <br /> ■ Data Collections Specification — A clear understanding of the data and the methods for <br /> collection and categorization ensure high quality data. DRG will work with the City of <br /> Redwood City to develop a detailed specification before actual data collection begins. <br /> ■ Field Quality C6eck — At the beginning of the project, l0% of an individual arborist's <br /> information will be checked for quality and completeness. All aspects of data collection <br /> will be reviewed. As the project progresses, the percentage ofqua(ity-controlled <br /> informatian may decrease based on an individual's abilities. DRG's supervisors will <br /> provide quality control of collected inforrnation. <br /> ■ Quality Assurance Methods — Where possible, quality assurance will be completed <br /> electronically so that quality checks are a permanent record of the data collected. This <br /> means there will be additional fields in the data files for quality assurance. Where this is <br /> not practical, quality assurance will be completed on paper forms, with a tally of all <br /> quality assurance activities. <br /> ■ Quality Assurance Reporting — Quality assurance information will be tallied by week <br /> ending date and provided to the client at least monthly, preferably by e-mail. A more <br /> detailed delivery procedure can be defined if required. Accuracy rates and classification <br /> of any errors will be included as appropriate. <br /> Safety <br /> DRG takes safety very seriously. As indicated in our prior discussion on page 5, we have an in- <br /> house safety program called "Road to Zero." A copy of that safety plan is included as an <br /> Appendix to this document on page 32. <br /> in regards to compliance with the California injury and Illness Prevention Program, our safety i <br /> program complies with (SB 198) and DRG follows all reporting requirements. This is I <br /> administered by our safety department at our corporate headquarters in Kent, Ohio. In addition, <br /> poRions of this program are covered in our weekly tailgates, and in our internal newsletter. <br /> Public ri�ht of way job preparation is handled by the individual inventory arborists. Each <br /> vehicle is equipped with cones to put on the street side of the vehicle. Each arborist wears a <br /> safety vest that identifies them as a contractor with Davey Resource Group. Each arborist also is <br /> required to wear a hardhat in the field. We make a point of not impeding traffic either on the <br /> sidewalk or in the street, so the public is not affected by our presence. <br /> Prepared for City of Redwood City, Catifomia � 3 <br /> Prepared by Davey Resource Group <br /> ; <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.