My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-03-21
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 1:17:21 PM
Creation date
3/17/2011 2:52:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 6.1 C ' <br /> REPORT Pa � <br /> c� co����i <br /> To the Honorable Mayor and ty <br /> From the Cit Mana er I <br /> March 21, 2011 I � <br /> SUBJECT <br /> Award of Contract — Glenwood Pump Station Improvements Project <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Glenwood Pump Station Improvements Project to Conco-West, Inc. of Manteca for � <br /> their responsive and responsible low bid of $513,680.00 and authorize the City Manager <br /> to increase the contract amount, if necessary, up to 10% of the amount awarded. <br /> BACKGROUND <br /> The Glenwood Pump Station is located within the Lakeview service zone near the <br /> intersection of Glenwood Avenue and Canyon Lane. The Lakeview service zone is one <br /> of the largest in the city and serves 625 homes within a one square mile area. The <br /> Glenwood Pump Station pumps water to the Lakeview Reservoir which supplies the <br /> water needs of all 625 homes in the Lakeview service zone. I <br /> The existing pump station is an unsheltered facility surrounded by a chain link fence. I <br /> Equipment is inadequately protected and secured. The proposed project provides a <br /> small metal structure to house and secure the pumps and the electrical/telemetry <br /> control equipment, a new emergency stand-by generator, enhanced pump control <br /> panels, and new piping. Housing the equipment, improving the controls, and including <br /> a generator increases the reliability and the security of pump station operations, <br /> addresses aesthetic concems, increases sound attenuation, and reduces the need for <br /> maintenance. <br /> Ten (10) bids were received at the bid opening on February 16, 2011 which are <br /> summarized below. <br /> Bidder Bid Amount <br /> Conco-West Inc. - Manteca $513,680.00 <br /> Blocka Construction, Inc. - Fremont $525,800.00 <br /> Anderson Pacific En ineerin Construction, Inc. — Santa Clara $555,000.00 <br /> S iess Construction Co., Inc. — Santa Maria �557,400.00 <br /> Lewis & Tibbitts, Inc. — San Jose $578,145.00 <br /> AI ha Ba Builders, Inc. — San Francisco $581,403.00 <br /> lonian Construction, Inc. - Millbrae $592,580.00 <br /> R.E. Smith Contractor, Inc. - Newcastle $633,000.00 <br /> Kinetics Mechanical Service Inc. - Livermore $636,700.00 <br /> LC General En ineerin & Construction, Inc. — San Francisco $659,276.90 <br /> En ineers Estimate $625,000.00 <br /> Recommended Bidder Conco-West� Inc. <br /> Substantiation: Conco-West, Inc. is the lowest responsive and responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.