My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 DLT&V
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 DLT&V
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2011 10:30:14 AM
Creation date
3/21/2011 10:30:10 AM
Metadata
Fields
Template:
Agreement
Contractor Name
DLT&V
PROJECT NAME
Consultant-Redwood City Engineering Services for Sewer Pump Station 10
RMP File Number
304.5
Date
3/16/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Responsibilities of Others <br /> 1.0 Client shall provide Civil and Electrical design drawings for Pump Station 10. The priority for electrical drawings is <br /> control schematics, P &IDs, single line diagrams, and the Nova Controls PLC SCADA Cabinet design. Additionally <br /> we will need copies of correspondence, service reports, O& M Manuals, and maintenance records. <br /> 2.0 The quality and detail of information provided by the City will impact our ability to assess operational intent of the <br /> original design. If the documentation is inadequate, we may need additional hours to develop as- built drawings. If <br /> necessary, DLT &V can provide these services for an additional fee. <br /> 3.0 CLIENT shall provide PLC program code for all PLCs at Pump Station 10. If PLCs are other than Allen Bradley or <br /> Modicon, Client shall provide development software for those PLCs <br /> 4.0 CLIENT shall provide responses to DLT &V for questions regarding the operation of Pump Station 10 in a timely <br /> manner to avoid schedule delays. <br /> 5.0 CLIENT shall provide free access to all equipment at Pump Station 10 such that DLT &V can collect sufficient data <br /> to determine causes of reliability issues. <br /> Deliverables <br /> 1.0 DLT &V will provide CLIENT with a 100% report in electronic format. Any additional submittal requirements and <br /> report changes requested by the CLIENT that are not included herein maybe considered beyond the scope and fee <br /> of this proposal. <br /> Exclusions and Exceptions <br /> 1.0 DLT &V will not obtain any permits. <br /> 2.0 The report issued to the City may include minor design modification recommendations. If the assessment and <br /> analysis of reliability issues determines that major design flaws exist in the pump station design, the report will <br /> recommend a major re- design of the lift station. The effort required to perform a major re- design is not included in <br /> this scope of work. <br /> 3.0 Document quantities identified in the attached Proposal Worksheet are estimates and at no time are intended to <br /> quantify work which will be performed. The aforementioned scope of services and level of effort is limited to the <br /> hours detailed on the attached Proposal Worksheets. Costs incurred due to conditions beyond DLT &V's control <br /> may result in additional charges billed on a Time and Material basis. <br /> 4.0 This fee proposal is based on DLT &V standards. The report will be prepared following DLT &V drafting and CAD <br /> standards, and text document formatting. If significant changes to the DLT &V standards are required, DLT &V <br /> reserves the right to request additional time and fees to convert to a new set of standards. <br /> 5.0 DLT &V will not be responsible for purchasing hardware or software under this proposal. <br /> 6.0 Should a condition exist, at no fault of DLT &V, that interrupts or prevents DLT &V from providing contracted <br /> services, DLT &V may cease work until the condition(s) are remedied. At the client's request, DLT &V may <br /> provide assistance to remedy the delaying condition(s), charged on a time and materials basis. <br /> 7.0 Excessive work interruption(s) by others that delay the provision of contracted services by DLT &V may result in <br /> additional service charges billed on a time and materials basis. <br /> 2010.11.1427 Redwood City Station 10 -Rev1 <br /> eonfldenHn} Summary Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.