Laserfiche WebLink
No. 10.1. <br /> GCR No. 2: Clearing & Grubbing 40,450.00 <br /> GCR No. 3: Construction of Detour Road, including Temporary Signage 94,554.00 <br /> & Striping <br /> GCR No. 4: Demolition and Removal of Detour Road, including 31,518.00 <br /> Temporary Signage & Striping <br /> Subtotal 166,522.00 <br /> DISCRETE COMPONENTS: <br /> Storm Drainage Improvements: Al labor,, aterial and equipment pertaining Costs to <br /> to the trenching and installation O the , storm drainage pipes, manholes, tie -ins to Complete <br /> existing drain inlets and service laterals; tie-in = to : the. existing storm„ water pump <br /> station and tie-ins io the infiltration gailer es as detailed on the KPFF drawings 8.1, <br /> 8.2 and 8.3 and approved by the City of Redwood City, Engineering & Construction, <br /> on 14 October 2009. <br /> SD No. 1: That portion of the work at the tie -in to the existing storm water lift 65,%0.00 <br /> station at storm drain manhole #13 to storm drain manhole #10, including tie -in to <br /> the existing drain inlet. Reference Drawing No. 8.1. <br /> SD No. 2: That portion of the work from storm drain manhole #10 to storm 32,284.00 <br /> drain manhole #9, including tie -in to the existing drain inlet. Reference Drawings No. <br /> 8.1 and 8.2. <br /> SD No. 3: That portion of the work from storm drain manhole #9 to storm 53,793.00 <br /> drain manhole #6, including tie -in to the existing drain inlet. Reference Drawing No. <br /> 8.2. <br /> SD No. 4: That portion of the work from storm drain manhole #6 to storm 63,085.00 <br /> drain manhole #3, including tie -in to the existing drain inlet and existing service <br /> lateral. Reference Drawings No. 8.2 and 8.3. End of Work for Phase 1 Sta. 20 +50. <br /> SD No. 5: That portion of the work at the round -about to connect the 8,590.00 <br /> landscape drainage and infiltration galleries to the new storm drainage system. <br /> Reference Drawing No. 8.1. <br /> Subtotal 223,712.00 <br /> Sanitary Sewer Improvements: All. labor, material and equipment pertaining Costs to <br /> to the trenching and installation of the sanitary sewer pipes, manholes,, and tie -ins to Complete <br /> existing service laterals as ;detailed` on'the" ;KPF drawings 9.1, 9.2, 9.3 and 9.4 and <br /> approved by th City of Redwood City,, Etgineering'+ c: Construction, on 14 October <br /> 24[09. <br /> SS No. 1: That portion of the work from the tie -in to existing manhole 64,184.00 <br /> sanitary sewer manhole #3, including new service lateral and sanitary sewer <br /> manhole #3A. Reference Drawings 9.1 and 9.2. <br /> SS No. 2: That portion of the work from sanitary sewer manhole #3 to 52,371.00 <br /> sanitary sewer manhole #5, including tie -in to existing service lateral. Reference <br /> Drawing 9.2. <br /> SS No. 3: That portion of the work from sanitary sewer manhole #5 to 35,998.00 <br /> sanitary sewer manhole #7, including tie -in to existing service lateral. Reference <br /> Drawings No. 9.2 and 9.3. End of Work for Phase 1 Sta. 20 +50. <br /> Subtotal 152,553.00 <br /> . Domestic Water Improvements All', labor, material and equipment pertaining Costs to <br /> to the; trenching and installation of the sanitary sever pipes,'inanholes,:and tie -its to Complete <br /> existing service laterals as detailedE n the KPEF'drawings 10,1, 10.2,10.3, and 10.8 <br /> and `approved' by the City of Redwood City, Engineering & Construction on 14 <br /> October 2009: <br /> DW No. 1: That portion of the work from Sta. 21 +41.47 to Sta. 13 +01.85, 208,014.00 <br /> including all tees, butterfly valves, air release valves, blow off valves, new fire • <br /> B2 -2 <br />