hydrant assemblies, new service lateral to One Marina, tie -in to existing 2 "service, <br /> and tie -in to existing 1" service. reference Drawings 10.1 and 10.2. <br /> DW No. 2: That portion of the work from Sta. 13 +01.85 to Sta. 20 +16.57, 174,138.00 <br /> including all butterfly valves, gate valves, air release valves, new fire hydrant <br /> assemblies, and tie -in to existing fire service lateral. Reference Drawings 10.2 and <br /> 10.3. End of Work for Phase 1 Sta. 20 +50. <br /> Subtotal 382,026.00 <br /> Recycled Water Improvements All labor, material and equipment pertaining Costs to <br /> to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to Complete <br /> existing= service,laterais as detailed on the KPFF drawings 11.1, 112,11 and 11.4 and <br /> approved by. the City of Redwood City, Engineering & Construction ,;on 14 Octob g <br /> 2009. �'ff <br /> RW No. 1: That portion of the work from Sta. 20 +58.91 to Sta. 13 +33.58, 82,766.00 <br /> including all tees, gate valves, blow off valves, air release valves, and new service <br /> lateral to One Marina. Reference Drawings No. 11.1 and 11.2. <br /> RW No. 2: That portion of the work from Sta. 13 +33.58 to Sta. 20 +23.06, 69,238.00 <br /> including all air release valves, blow off valves, gate valves, meter box, and new <br /> service laterals. Reference Drawings 11.2 and 11.3. End of Work for Phase 1 Sta. <br /> 20 +50. <br /> Subtotal 152,004.00 <br /> Concrete Improvements: All labor, material and equipment pertaining to the Costs to <br /> demolition of existing concrete and the forming, placing, stripping of new concrete as , Complete <br /> detailed _ on the KPFF drawings 7.1, 7.2, 7.3, and 7.4 and approved by the City 'of <br /> Redwood City, Engineering & Construction, on 14 October 2009. <br /> Concrete No. 1: That portion of the work defined as all new curb, gutter, curb 135,371.00 <br /> cuts at filtration planters, truncated HC domes and driveway approaches. <br /> Concrete No. 2: That portion of the work defined as the new round - about. 129,985.00 <br /> Concrete No. 3: That portion of the work new bicycle path. 77,149.00 <br /> Concrete No. 4: That portion of the work new sidewalk. 77,103.00 <br /> Subtotal 419,608.00 <br /> Roadway Improvements: All labor, material and equipment pertaining to the Costs to <br /> demolition of existing AC paving related base material and the excavation, Complete <br /> grading, placement and compaction of new Class II <AB base, new AC paving, new <br /> striping and signage as detailed on the KPFF drawings 7.1, 7.2, 7. 3, 7.4, 12.1, 12.2 and <br /> 12.3 and approved by the City of Redwood City, Engineering & Construction, on 14 <br /> October 2009: <br /> Roadway No. 1: That portion of the work defined as excavation, grading, 198,522.00 <br /> Class II AB base rock, AC paving for the entire roadway. <br /> Roadway No. 2: That portion of the work defined as permanent striping and 17,285.00 <br /> signage, <br /> Subtotal 215,807.00 <br /> Street Light & Pedestrian Light Imtprovements All labor, material and Costs to <br /> equipment pertaining to the demolition of existing streetlights, installation, of new Complete <br /> street lights, new pedestrian lights, conduits, pull bodes, =:electrical conductors and = , <br /> related appurtenances as detailed on KPFF drawings 16.1;'.16.2, and 16.3 and approved <br /> by the City: of Redwood City, Engineering *r Construction, on 14 October 2009. <br /> SL /PL No. 1: That portion of the work defined as demolition of existing 72,724.00 <br /> street lights, installation of new street lights and related pull boxes, conduit and <br /> electrical conductor, and tie -in to existing service. <br /> SL/ PL No. 2: That portion of the work defined as new pedestrian lights and 88,884.00 <br /> related pull boxes, conduit and electrical conductor. <br /> Subtotal 161,608.00 <br /> B2 -3 <br />