Laserfiche WebLink
City of Redwood City <br /> Proposal to Prepare Proposition 1E SWFM Grant Application and Bay Area 1RWMP Project Template <br /> • Timing of seismic event relative to storm events <br /> • Probability of flood management structure failing due to storm events <br /> • Resulting damage due to flood management structural failure <br /> RMC will develop a cost and benefits summary which will provide an overall estimate of the <br /> benefits of the project. RMC will coordinate with the City to obtain any of the following <br /> information or other information available to develop some estimate of flood damage <br /> reduction benefits: <br /> • Flood inundation maps with and without the project <br /> • Flood Frequencies without the project for 500 -year, 100 -year, 75 -year, 50 -year, and 25- <br /> year storm events <br /> • Depth and duration of inundation assuming flooding occurs as a consequence of 500- <br /> year, 100-year, 75 -year, 50 -year, and 25 -year storm events <br /> • Land uses on inundated land included an inventory of assets and structures that would <br /> be impacted <br /> • Flood frequencies with the project <br /> Deliverables: <br /> • Draft Economic Analyses for review by the City. <br /> 3.7 Compile and Prepare Program Preferences Discussion (Attachment 11) <br /> RMC will develop a discussion on how the Project assists in meeting the Program Preferences, <br /> identify the specific Program Preference(s) that the Project will meet, the certainty that the <br /> Project will meet the Program Preference(s), and the breadth and magnitude to which the <br /> Program Preference(s) will be met. <br /> Deliverables: <br /> • Draft Program Preferences Discussion for review by the City. <br /> 3.8 Compile AB 1420 and Water Meter Compliance Information (Attachment 12) <br /> RMC will coordinate with the City to obtain the following information for compilation into the <br /> application package: <br /> • AB 1420 self certification documentation <br /> • Water Meter compliance self certification form. <br /> 3.9 Consolidate Draft Grant Application for Review <br /> RMC will consolidate revised drafts from Tasks 3.1 through 3.8 into a draft application package. <br /> Deliverables: <br /> • Draft Application Package containing all attachments for review by the City. <br /> 11 'Page <br /> RMC Water and Environment <br />