My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-07-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:39:36 PM
Creation date
7/10/2003 4:24:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Interview
Agency Type
City Council
Date
7/14/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1-02 <br />The low bid of $124,945 is 10.75% lower than the Engineer's Estimate of $140,000. <br />A complete copy of the Agreement is available for review in the City Clerk's Office. <br />Alternatives <br />1. Leave Wellesley Crescent Park circle as it is now, with temporary painted lines and <br />plastic delineators. <br />2. Remove some of the higher cost items from the plans (landscaping, and concrete <br />pavers), which will change the architectural quality of the project. <br />3. Only construct two of the four islands. <br />Fiscal Impacts <br />The original budget of $150,000 for this project was established in 2001 Gas Tax <br />Construction Fund. To date, we have a balance of approximately $130,000 in the <br />budget, for construction. For this size of project, the City needs to reserve <br />approximately $20,000 for both construction administration and contingencies. To this <br />date, the Gas Tax Construction Fund has a $256,900 contingency budget balance. The <br />potential use of $20,000 for this project will leave a contingency account balance of <br />$236,900. <br />Chu Chang Bruce Lledstrand Ed Everett <br />Supervising Civil Engineer Community Development Services Director City Manager <br />CCss <br />s/ library/reports /chu /Award_Wellesley Crescent Landscape <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.