My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Peninsula Corridor Joint Powers Board-JPB
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Peninsula Corridor Joint Powers Board-JPB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2011 1:28:19 PM
Creation date
4/22/2011 9:46:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Peninsula Corridor Joint Powers Board-JPB
PROJECT NAME
Railroad construction and maintenance agreement-San Mateo Co. Grade crossing improvements project
RMP File Number
304
Date
3/26/2009
MO Ref
09-040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE, in consideration of the foregoing, the parties agree as follows: <br /> 1. Construction Costs. Railroad shall furnish, or cause to be furnished, at its sole <br /> cost and expense, all labor, materials, tools, and equipment needed to complete the <br /> Improvements and shall pay for the design, construction, construction management and indirect <br /> project costs it incurs for the Project. Notwithstanding the above, however, City shall bear its <br /> own costs related to the Project, including time that its staff or consultants spend on review of <br /> design or inspections. City shall waive all City permit or other fees with regard to the Project <br /> and the Improvements as well as any other type of fee for any and all work associated with the <br /> Project. <br /> 2. Construction Standards/Design. The Railroad is designing and constructing the <br /> Project. The design and construction of the Improvements shall comport with Railroad's <br /> adopted standards, specifically JPB Standards Volume I and Volume II, dated April 15, 2007, as <br /> amended, except when they involve city streets that are located outside of the Right -of -Way, <br /> which shall be designed to City standards. If no City standards exist for particular features of the <br /> work, the improvements shall be designed to applicable Caltrans standards, or if no Caltrans <br /> standards apply, to such standards as JPB shall reasonably determine to apply. JPB shall consult <br /> with City and accommodate reasonable City comments and suggestions on any changes that <br /> affect work outside the Right -of -Way or in areas that City will be responsible to maintain. JPB <br /> to have the right to make changes during construction subject to the terms of this agreement. <br /> 3. Schedule. The contract for the construction of the Project is expected to be <br /> awarded by JPB prior to the end of December 2008 and the work is to be completed within 78 <br /> weeks from the issuance to the contractor of a notice to proceed ( "NTP "). It is understood, <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.