Laserfiche WebLink
6. Permitting, Approvals and Contract Requirements. <br /> a. Environmental Review. JPB will be the lead agency under CEQA and <br /> will obtain any required environmental clearance for the project. JPB's Contractor will be <br /> subject to all applicable Storm Water Pollution Prevention Plan (SWPPP) requirements, <br /> including current standard best management practices, including control of run -off, dust, mud, <br /> etc. <br /> b. Inspections and Reporting. Railroad or its contractor shall provide all <br /> flagging and engineering inspection required in connection with construction of said <br /> Improvements, but City shall have the right to inspect any Improvements to be owned or <br /> operated by the City. JPB will allow City to inspect work that City will maintain. JPB Resident <br /> Engineer and/or inspector shall coordinate with City on inspection schedule. JPB will keep City <br /> informed of progress of construction and will coordinate public outreach with City. City will <br /> designate point of contact for construction coordination. JPB will consult with City on any <br /> changes to the contract plans that affect work outside the Right -of -Way, areas that City will be <br /> responsible to maintain, or which the City has had substantial input (including but not limited to, <br /> temporary traffic plans and public outreach). <br /> c. City Permits and Approvals. To facilitate the construction of the <br /> Improvements, City shall grant to Railroad a temporary Construction Permit in the form attached <br /> to this Agreement as Exhibit B. The City confirms that to the best of its knowledge, it has the <br /> ability to issue and enforce Construction Permits over all public properties not owned by railroad <br /> as required to effect reconstruction of the streets as contemplated in the project design. City will <br /> provide pre - approval, upon due review and comment, of the Construction Permit prior to the JPB <br /> 5 <br />