Laserfiche WebLink
March 20, 2002 <br />Redwood City S02-215 <br /> 7) Test the fiber cable and provide an electronic test report. <br /> 8) At the 1400 Franklin office we will remove the existing small fiber patch panel <br /> and modify the exiting patch panel to accept SC connectors. <br /> 9) Termination of fiber cable will be with SC pigtails using the fusion method. <br /> 10)New cable to be transferred to the panels on a weekend outage to last <br /> approximately 4-6 hours. <br /> 11)Removing existing fiber cable after new cable is in place and working.. <br /> 12)No allowance for repairs to existing unidentified utilities. <br /> <br />Excludes: 1) Permit fees if required. <br /> 2) Performance and payment bonds. <br /> <br />Payment Terms: <br />Net (30) thirty days from receipt of invoice. <br /> <br />If I can be of further assistance please don't hesitate to contact me a'~ our office, <br />1-800-440-5181. <br /> <br />Respectfully submitted, <br />VCl Telcom, Inc. <br /> <br />Tom Wilbert <br />VP Sacramento Branch <br /> <br />C:\Documents and Settings\cbeth\Local Settings\Temporary Intemet Files\OLK3\S02-215.doc <br /> <br /> <br />