My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-04-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-04-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:52:10 PM
Creation date
4/5/2002 8:15:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
4/8/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 26, 2002 <br /> <br />Chu Chang PH 650-780-7281 <br />Redwood City FX 650-364-3539 <br />1017 Middlefield Rd <br />Redwood City, CA 94063 <br /> <br />RE: Fiber & Conduit relocation Bid <br /> <br />Chu, <br /> <br />We are pleased to provide our proposal in the amount of $18~731.00 to perform the <br />following scope of work. <br /> Lump sum Base Bid $18,731.00 <br /> <br />Scope of work: <br />The purpose of this project is to relocate the existing fiber cable and conduit system in <br />order to facilitate a skate park. At the north end of the park the conduit system is routed <br />through the area where the skate park is to be located. It will be necessary to excavate <br />a section of approximately 100' from a depth of 5' to an approximate depth of 11' at the <br />northern most section. VCI will utilize the existing conduit system and override the <br />conduit to place the new 12 Fiber single mode cable. <br /> <br />Work can commence Monday next week, fiber cable to arrive in two weeks. <br /> <br />Clarifications: <br /> <br />Includes: 1) Prevailing wage scale as required. <br /> 2) Excavate and backfill approximately 100' of trench ranging from 3' to 11' deep. <br /> 3) Intercept conduit system in two locations and installing pull boxes. <br /> 4) Existing system to remain in use during the excavation and cable placing work. <br /> 5) Furnish and install a 12 Fiber single Mode cable approximately 3,000' feet to <br /> connect the two buildings. <br /> 6) Install 12 SC type fiber terminations on this cable. <br /> <br />C:\Documents and Settlngs\cbeth\Local Settings\Temporary Intemet Files\OLK3\S02-215.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.