Laserfiche WebLink
Median Island Landscaping was also added after the award of contract. <br /> The narrow medians (less than 5 feet wide) were originally designed with <br /> dver cobble to reduce risk of accidents to maintenance personnel. This was <br /> changed to landscaping to comply with requests from neighborhood <br /> associations. <br /> <br /> The walkway at the SW corner of Marine Parkway and Bridge Parkway was <br /> extended along Bridge Parkway to the foot of the bridge. <br /> <br /> 2. Change Order #2 in the amount of $6,503 was issued to reconcile all the <br /> miscellaneous quantities and all outstanding extra work. <br /> <br /> The total of the two Change Orders amount to $223,308.56 or 10% of the original <br /> contract amount. <br /> <br />RGW is one of the bigger roadway contractors in the Bay Area, and has been winning <br />bids on the Peninsula. The Auxiliary Lanes from Ralston Avenue' to Hillsdale <br />Boulevard; the Millbrae Interchange, and the John Daly Boulevard Project, are all being <br />constructed by RGW. Their roadway construction expertise is impeccable, and it shows <br />in the final product. <br /> <br />Next Steps <br />If City Council accepts this project, staff will move forward to close out the project. The <br />material and performance bonds will be released, and the-retention monies will be paid <br />to the Contractor. This action will aisc commence the standard one-year warranty <br />period. <br /> <br />Fiscal Impacts <br />Funds for this project are allocated in the following four funding sources: <br /> <br /> 1. STID = $2,078,673 <br /> 2. TAD = $69,414 for the pedestrian/bicycle path, the <br /> 3. GID = $229,620 for the improvement at Marine Parkway and Oracle (East) <br /> and the signal work at Redwood Shore Parkway and Bridge Parkway <br /> 4. Gas Tax Fund = $74,925 for miscellaneous paving. <br /> <br />All funds were allocated at the time the contract was awarded. <br /> <br /> etsanti /J~yPatterson Ed Everett <br /> ~r Civil Engineer ~/,l~l~nager, Engineering & ConstructionCity Manager <br /> <br />SPV:ss <br />S/library/reports/Acceptance RWS Street Sys Imp.doc <br /> <br /> <br />