My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-04-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 2:58:54 PM
Creation date
5/12/2011 2:48:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
4/25/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 16 <br />Attachment 2 <br />Construction Management Services <br />Glenwood Pump Station <br />C, Final Inspection and Punch List. <br />1, Redwood City will participate and provide input on f inal <br />inspection, <br />2. The City will provide design input on final inspection items. <br />a. Covello will prepare and issue the punchlist with input from <br />Redwood City. <br />b. Covello and Redwood City will verify jointly that the <br />punchlist work has been completed, <br />IV. Warranty Coordination <br />A. Redwood City will coordinate warranty work after the start of the warranty <br />period, <br />March 25, 2011 Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.