Laserfiche WebLink
EXHIBIT "A" <br /> Scope of Services and Fee Schedule <br /> DKF Solutions Group <br /> 170 DOGWOOD LANE PHONE 707.373.9689 <br /> VALLE)°, CA 94591 -8056 FAX 707.647.7200 <br /> "Proposal From DKF Solutions Group, LLC For Services To" <br /> "Redwood City, C4 N <br /> Proposal No. o. 1 10 3 2 8a <br /> This PROPOSAL is made on March 28, 2011 by and between DKF Solutions Group, LLC ( "CONTRACTOR ") and the City <br /> of Redwood Clty, CA (hereafter referred to as the CLIENT). This PROPOSAL is valid until April 30, 2011. <br /> SCOPE: All work will be performed in accordance with CaIOSHA, State Water Resources Board, Regional Water <br /> Quality Control Board and other applicable regulatory standards. <br /> Please Select the Desired Items: <br /> Sanitary Sewer Overflow and Backup Response Plan and SSMP Requirements <br /> ITEM PRICE <br /> Update Sanitary Sewer Overflow and Backup Response Plan in accordance with the DKF <br /> Solutions Group, LLC template $1,750 <br /> SSO/Backup Response Summary Poster $200ea <br /> On site training on the completed SSO /Backup Response Plan $1,200 <br /> Bypass and/or Spill Response Procedures, photo based incorporating local sewer and storm <br /> maps, required equipment and other structure - specific considerations in accordance with <br /> SSMP requirements for: $45,000 <br /> 26 Pump Stations at Redwood Shores (estimating 390 <br /> 6 Pump Stations at Seaport hours billed <br /> 15 ARVs (will include exercising SOP) hourly at <br /> 28 DW Facilities $115 /hour) <br /> Vacuum Truck Standard Operating Procedure, photo based $2,500ea <br /> Main Line Jetting Standard Operating Procedure, photo based $2,000ea <br /> Continuous Rodder Standard Operating Procedure, photo based $1,800ea <br /> Lower Lateral Electric Line Cleaning Standard Operating Procedure, photo based $900ea <br /> Lower Lateral CCTV Inspection Standard Operating Procedure, photo based $900ea <br /> Electric Eel Standard Operating Procedure including setup, operation and debris removal from <br /> main line easement, photo based $900ea <br /> Tow Behind Portable Pump Operation Standard Operating Procedure including setup, <br /> operation and bypass discharge procedure, photo based $900ea <br /> Lateral Line Repair Standard Operating Procedure including pre and post job work zone <br /> signage procedures, photo based $1,500ea <br /> COMPENSATION: Payment for each item or service selected in SCOPE is due upon delivery with payment terms of <br /> Net 30 according to the schedule below. Additionally, Contractor reserves the right to collect reimbursable expenses <br /> not to exceed $500. Reimbursable expenses include administrative costs such as postage and certificates of insurance. <br /> Invoice/Payment Schedule; <br /> Delivery of draft products for review: 60% <br /> Delivery of final products: 40% <br /> In Person Training: 100% due upon completion <br /> Hourly Work will be invoiced at $115 /hour monthly showing time spent by project <br /> AVAILABILITY: Contractor is available on or after April 18, 2011. <br /> STATE OF THE ART RISK MANAGEMENT Tool! FOR PUBLIC AGENCIES 1 <br />