My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:49:59 AM
Creation date
8/12/2003 9:35:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design of courthouse square
RMP File Number
405
Date
4/28/2003
MO Ref
RD-03-12 RD-05-04 RD 06-223
Amendment
Yes
Box
6589 & 6600 (?)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scope of Services, Page <br /> <br />- EXHIBIT A- <br /> <br />8. <br /> <br />Preferred catalog furnishings selections <br /> <br />a. <br />b. <br />c. <br />d. <br /> <br />e, <br />f. <br />g, <br />h, <br />i. <br /> <br />Lighting type I <br />Lighting type 2 <br />Seating <br />Trash Receptacle <br />Bollard <br />Bicycle Rack <br />Planter pot I <br />Planter pot 2 <br />Drinking Fountain <br /> <br />9. <br /> <br />Recommended plant material palette <br /> <br />a, <br /> <br />b. <br />c. <br />d. <br /> <br />e. <br />f. <br /> <br />Coordinate with City, SFE and arborist subconsultant on recommended species <br />(note: SFE will retain an arborist for review of recommended species in terms of <br />latest horticultural advice and current nursery availability) <br />Tree type I <br />Tree type 2 <br />Plant material I <br />Plant material 2 <br />Plant material 3 <br /> <br />10. <br /> <br />Recommended color and materials samples <br /> <br />a. <br />b. <br />c. <br />d. <br /> <br />e, <br /> <br />Paving color/material I <br />Paving color/material 2 <br />Masonry furnishing color/material I <br />Masonry furnishing color/material 2 <br />Metalwork paint color/fInish <br /> <br />II. <br /> <br />Provide photoreduced copies <br /> <br />N. <br /> <br />Concept-Level Cost Estimate - Note: the concept level cost estimate will be delivered 3 weeks <br />after completion of the preferred design concept package. <br /> <br />o. <br /> <br />Prepare package for estimator (SFE) including quantity take-offs; coordinate with electrical <br />engineer to include parameters for special events audio and power (note - summary <br />memorandum of assumptions for electrical service will be provided); coordinate with <br />estimator <br /> <br />I. <br /> <br />2. <br /> <br />Minimal cost research for selected items <br /> <br />3. <br /> <br />Receive/review draft cost estimate; Q&A with estimator <br /> <br />4. <br /> <br />Receive/review.edited report; forward with memo to City <br /> <br />City Staff Meeting - Review and Finalize Preferred Concept Design <br /> <br />P. <br /> <br />I. <br /> <br />Prepare large format graphics and presentation <br /> <br />2. <br /> <br />Attend Meeting, record Staff direction and conunents <br /> <br />Modify final design concept alternatives per City Staff comments - Note: As previously, the <br />task effort levels shown for modifications directed by City Staff are estimates of average levels of <br />
The URL can be used to link to this page
Your browser does not support the video tag.