Laserfiche WebLink
<br />Scope of Services, Page <br /> <br />- EXHIBIT A- <br /> <br />8. <br /> <br />Preferred catalog furnishings selections <br /> <br />a. <br />b. <br />c. <br />d. <br /> <br />e, <br />f. <br />g, <br />h, <br />i. <br /> <br />Lighting type I <br />Lighting type 2 <br />Seating <br />Trash Receptacle <br />Bollard <br />Bicycle Rack <br />Planter pot I <br />Planter pot 2 <br />Drinking Fountain <br /> <br />9. <br /> <br />Recommended plant material palette <br /> <br />a, <br /> <br />b. <br />c. <br />d. <br /> <br />e. <br />f. <br /> <br />Coordinate with City, SFE and arborist subconsultant on recommended species <br />(note: SFE will retain an arborist for review of recommended species in terms of <br />latest horticultural advice and current nursery availability) <br />Tree type I <br />Tree type 2 <br />Plant material I <br />Plant material 2 <br />Plant material 3 <br /> <br />10. <br /> <br />Recommended color and materials samples <br /> <br />a. <br />b. <br />c. <br />d. <br /> <br />e, <br /> <br />Paving color/material I <br />Paving color/material 2 <br />Masonry furnishing color/material I <br />Masonry furnishing color/material 2 <br />Metalwork paint color/fInish <br /> <br />II. <br /> <br />Provide photoreduced copies <br /> <br />N. <br /> <br />Concept-Level Cost Estimate - Note: the concept level cost estimate will be delivered 3 weeks <br />after completion of the preferred design concept package. <br /> <br />o. <br /> <br />Prepare package for estimator (SFE) including quantity take-offs; coordinate with electrical <br />engineer to include parameters for special events audio and power (note - summary <br />memorandum of assumptions for electrical service will be provided); coordinate with <br />estimator <br /> <br />I. <br /> <br />2. <br /> <br />Minimal cost research for selected items <br /> <br />3. <br /> <br />Receive/review draft cost estimate; Q&A with estimator <br /> <br />4. <br /> <br />Receive/review.edited report; forward with memo to City <br /> <br />City Staff Meeting - Review and Finalize Preferred Concept Design <br /> <br />P. <br /> <br />I. <br /> <br />Prepare large format graphics and presentation <br /> <br />2. <br /> <br />Attend Meeting, record Staff direction and conunents <br /> <br />Modify final design concept alternatives per City Staff comments - Note: As previously, the <br />task effort levels shown for modifications directed by City Staff are estimates of average levels of <br />