Laserfiche WebLink
<br />Scope of Services, Page 7 <br /> <br />1. Prepare plaza specifications notes; transmit to FMG <br />2. Prepare custom features specifications notes & drawings; transmit to SFE <br />3. Receive/ review draft specifications <br />4. Return first draft w/ comments <br /> <br />B. Pavilions, Fountain Bowls, Seat Walls Specification Information <br /> <br />Task 10. 60% Submittal <br /> <br />A. Plaza plans & specs Quality Control <br /> <br />1. Receive and review drawings and specs from SFE; telephone Q&A <br />2. Prepare and forward redlines to SFE <br /> <br />B. Pavilions, Fountains, Fountain Bowl, Planter Bowl- Quality Control <br /> <br />1. Receive review drawings and specs from FMG; telephone Q&A <br />2. Prep and forward redlines to FMG <br /> <br />C. Attend all-day 60% Review Session in Redwood City <br /> <br />D. Receive one marked up set from City Staff; follow-up teleconference; transmit to SFE <br /> <br />E. Memorandum to design & engineering team re: CITY direction <br /> <br />Task 11. Cost Estimate @ 60% <br /> <br />A. Allowance for cost research on furnishings, paving materials, etc. <br /> <br />B. Receive and review draft cost estimate; follow-up Q&A with D&E team <br /> <br />c. Value engineering allowance incl. coordination with CITY <br /> <br />D. Memo to team regarding value engineering design changes <br /> <br />PHASE III. COMPLETE CONSTRUCTION DOCUMENTS <br /> <br />Task 1. Plaza plans & specs Quality Control <br /> <br />A. Receive and review drawings and specifications from SFE; telephone Q&A <br /> <br />B. Prepare and forward redlines to SFE <br /> <br />Task 2. Custom furnishing Quality Control <br /> <br />A. Receive and review drawings and specs from FMG; telephone Q&A <br /> <br />B. Prep and forward redlines to FMG <br />