Laserfiche WebLink
<br />Scope of Services, Page 6 <br /> <br />K. Bike racks <br /> <br />L. Trash Containers <br /> <br />M. Cafe tables & chairs <br /> <br />N. Coordinate with City & DES re: signage <br /> <br />O. Design Detailing coordination with D&E Team <br /> <br />P. Design detailing coordination with City Project Manager <br /> <br />Task 7. Plant Selections <br />A. Select primary palm tree; discuss tree size and tagging with SFE <br /> <br />B. Select flowering trees that flank courthouse on sides of portico <br /> <br />C. Select accent plantings including those for planter bowls, seatwalls and base of trees <br /> <br />D. Planting design working session with SFE <br />Task 8. Materials & Finishes <br /> <br />A. Select paint or powdercoat color for street light, other manufactured furniture <br /> <br />B. Concrete color for pavilion walls, accent; coordination wi FMG <br /> <br />C. Pavilion primary metal finish <br />D. Pavilion accent metal finish <br /> <br />E. Pavilion exposed truss metal finish <br /> <br />F. Cafe window, access door finish <br /> <br />G. Pavilion entablature lettering: coordination wi FMG <br /> <br />H. Fountain and planter bowl concrete color; coordination wi FMG <br /> <br />1. Concrete seat wall color <br /> <br />J. Final color adjustments to pre selected paving, cafe table furniture, etc. <br /> <br />Task 9. Specifications <br />A. Plaza Specifications information <br />