My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:49:59 AM
Creation date
8/12/2003 9:35:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design of courthouse square
RMP File Number
405
Date
4/28/2003
MO Ref
RD-03-12 RD-05-04 RD 06-223
Amendment
Yes
Box
6589 & 6600 (?)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scope of Services, Page 5 <br /> <br />G. Check standard cafe table sizes to be used <br /> <br />H. Prepare AutoCad layout plans; transmit to CM <br /> <br />I. Respond to questions from CM (e.g. resolution of utility conflicts) <br /> <br />J. Receive and review graded base from CM <br /> <br />K. Respond to questions from D&E team <br /> <br />Task 6. Refine plaza design details <br /> <br />A. Plaza, podium and sidewalk paving <br /> <br />1. Color options review/ selection; paving sample orders and review <br />2. Paving design for central plaza showing ornamental pattern and location of score lines <br />3. Paving design for flowering tree in bosk areas <br />4. Paving design for podiums <br />5. Paving design for sidewalks <br />6. Portico and Courthouse edge paving; coordination with DES <br /> <br />B. Podium stairs & ramps <br /> <br />C. Podium retaining/seat wall & planter <br /> <br />1. Coordination with FMG re: decorative scrim detail on fountain/seat wall <br />2. Coordination with SFE & irrigation engineer <br />3. Prepare design and sketch <br /> <br />D. Determine location of Flagpo1e(s) within plaza layout <br /> <br />E. Choose railings for podium ramps <br /> <br />F. Plaza Lighting <br /> <br />1. Coordination with HLB and Electrical Engineer <br />2. Plaza Light standard, lamping <br />3. Flanking street light standard, lamping; coordinate w/ CITY <br />4. Uplight housing and lamping; transmit desired criteria to HLB <br /> <br />G. Tree well treatment(s): podium, flowering tree <br /> <br />H. Planting strips along flanking streets <br /> <br />I. Comers, parking bays and curbs <br /> <br />J. Choose bench for fountain adjacent seating/bosque area <br />
The URL can be used to link to this page
Your browser does not support the video tag.