My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:49:59 AM
Creation date
8/12/2003 9:35:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design of courthouse square
RMP File Number
405
Date
4/28/2003
MO Ref
RD-03-12 RD-05-04 RD 06-223
Amendment
Yes
Box
6589 & 6600 (?)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SFE <br /> <br />Narrative Scope of Services prepared for Freedman, Tung & Bottomley <br />Courthouse Plaza <br />City of Redwood City <br />January 24, 2005 <br />Corresponds to Staffing and Budget Spreadsheet: v. 3 <br /> <br />This Narrative Scope of Services corresponds to our Staffing and Budget Spreadsheet, <br />and describes the design development, construction document and construction <br />administration tasks to be performed by SFE Design, Inc. (SFE) in support of Freedman, <br />Tung & Bottomley (FTB) and the project design team. SFE will serve as the landscape <br />architect of record, and provide the following services to FTB and the City of Redwood <br />City. <br /> <br />Phase I: Project Start-Up <br /> <br />1. Attend Working Session and Scheduling Meeting with Team: Attend a meeting <br />with the PS&E team during Phase 1 to review the concept design prepared by FTB and to <br />define the schedule for the Design Development, Construction Document, Bid Period and <br />Construction Period. <br /> <br />2. Prepare Working Session Memorandum/Action List & Distribute: Following the <br />Working Session and Scheduling Meeting, prepare a memorandum that summarizes the <br />key meeting decisions and issues, and identifies the key action items for each team <br />member. <br /> <br />3. Prepare SFE PS&E Schedule and Submit to FTB: Prepare the SFE Schedule <br />based on the decisions made in the Working Session and Scheduling Meeting and submit <br />to FTB for review and coordination with the other subconsultants. <br /> <br />4. Revise the SFE PS&E Schedule: Based on FTB's review, revise the SFE PS&E <br />schedule and resubmit to FTB for final coordination with the project team. <br /> <br />5. Receive AutoCad Schematic Design from FTB: Receive and review the schematic <br />design from FTB. The schematic AutoCad design will be the background for the <br />preparation of the project construction document base plan. <br /> <br />6. Prepare Preliminary Plaza Grading Plan for FTB and Civil Review: Using the <br />Autocad Schematic Design and the project topographic survey, prepare a preliminary <br />grading plan for review by FTB and the civil engineer. The grading plan will use spot <br />elevations and contour lines to convey the grading design intent. <br /> <br />7. Coordinate w/FTB and Arborist regarding Primary and Secondary Plant <br />Selections: Coordinate with FTB and the project Arborist on the primary and secondary <br />plant selections for the project. This is an opportunity to select plants that meet the <br /> <br /> <br /> <br />+ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.