Laserfiche WebLink
<br />- EXHIBIT A - <br /> <br />CITY OF REDWOOD CITY <br /> <br />DESIGN OF COURTHOUSE SQUARE <br />COMMUNITY WORKSHOPS AND CONCEPT DESIGN PHASE <br /> <br />Scope of Services (FTB onM <br />(V.2: April 3, 2003) <br /> <br />TABLE OF CONTENTS <br /> <br />PROJECf OVERVIEW ...."""""."."...............""".."""..."......"......"".""""......""....."".....................""".......""...... I <br />PROJECf T ASKS.............."""""".""..............""".."."...""....""....""..""."......""...."..".................".""....."""........2 <br /> <br />PROJECf STAFFING AND BUDGET...........""""".".".""....""....""..."""......""""""""""""""""""""""""""", I I <br />TERMS """"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""...""""...."..........12 <br /> <br />PROJECT OVERVIEW <br /> <br />A. Freedman Tung & BottoDÙey (FTB), in association with its design subconsultants, will prepare design <br />concept recommendations for the installation of a capital improvement project as follows: <br /> <br />1. <br /> <br />Courthonse Square <br /> <br />It is our understanding that at the Broadway side of the 19JO Historic Courthouse building, <br />the City will be demolishing and removing the 1940 Fiscal Building and restoring the <br />portico of the Courthouse Building. A cleared site will be provided to the project. <br />Tlús project entails the preparation of a conceptual design of a Courthouse Square Plaza <br />according to input received from Community Workshops, other participating group(s), City <br />Council and Commissions, and City Staff. <br />The Plaza's design may include a special feature such as a fountain or shelter structure, <br />again depending on design direction. <br />Design recommendations from the FTB team for the Courthouse Square will include the <br />area from the façade of the 1910 Historic Courthouse to the façade of the Historic Fox <br />Theatre (across Broadway), inclusive of the segment of Broadway between Hamilton Street <br />and Middlefield Road. On side street exposures, recommendations will include areas up to <br />the back of curb at Middlefield Road and Hamilton Street. <br />The completed conceptual design for the Courthouse Square will be the basis for a <br />following construction documents phase (not included in this Scope of Services). <br /> <br />2. <br /> <br />Marshall Street frontage landscape <br /> <br />It is our understanding that at a future date to be established, the City will demolish the <br />1941 North Annex building and restore the Marshall Street side of the 1910 Historic <br />Courthouse. <br />As part of this Courthouse Square Conceptual Design process, a conceptual design will be <br />prepared for the grounds of the Marshall Street side of the 1910 Historic Courthouse in <br />anticipation of that future demolition and restoration. <br />Assuming the demolition of the 1941 North Annex Building, the Marshall Street frontage <br />landscape project area is recommended to extend from the to-he-restored Marshal Street <br />façade of the 1910 Historic Courthouse Building to the back of sidewalk across Marshall <br />Street, inclusive of the segment of Marshall between Hamilton Street and Middlefield <br />Road. We recommend inclusion of the street right-of-way in this block to insure a <br />complete consideration of open space fonn and function. <br />