Laserfiche WebLink
8A -i� <br />freeway widening would require the approval of Caltrans, which is beyond the City's <br />control and unlikely. <br />Overriding Considerations: The environmental, economic, social and <br />other benefits of the Project override the significant impact described above, as more <br />fully stated in the Statement of Overriding Considerations in Section 3 of the Resolution. <br />E. US 101 Ramp Operations under Cumulative with Higher Occupancy Scenario <br />Conditions <br />Potential Impact: The Cumulative with Higher Occupancy Scenario <br />Conditions would exceed the capacity of the northbound US 101 off -ramp to Woodside <br />Road during the PM peak hour. (Significant) <br />Mitigation: The following mitigation measure, as set forth in the FEIR, <br />would potentially avoid or substantially reduce the significance of the impact described <br />above, but is not feasible and therefore is not adopted: <br />• Mitigation Measures TR -12.1 <br />Finding: Mitigation Measure TR -12.1 is not feasible. There is no other <br />feasible mitigation measure available to avoid or substantially reduce the significant <br />environmental impact described above. <br />_ Mitigation of the impact described above to a less- than - significant level <br />would require the addition of another lane on the northbound US 101 off -ramp to <br />Woodside Road. However, freeway widening would require the approval of Caltrans, <br />which is beyond the City's control and unlikely. <br />Overriding Considerations: The environmental, economic, social and <br />other benefits of the Project override the significant impact described above, as more <br />fully stated in the Statement of Overriding Considerations in Section 3 of the Resolution. <br />IV. AIR QUALITY <br />A. Construction Dust <br />Potential Impact: Construction activities at the project site, including <br />operation of equipment and movement of construction vehicles, could result in <br />temporary air quality impacts. (Potentially Significant) <br />Mitigation: The following mitigation measures, as set forth in the Initial <br />Study and the FEIR, are hereby adopted and will be implemented as provided in the <br />Mitigation Monitoring Program: <br />The project applicant shall implement a construction dust abatement <br />program including the following measures: <br />M <br />