Laserfiche WebLink
<br /> 1 <br />Statement of Oualifications: <br />1) Descriotion of Firm/ResDOndinf! Office: <br /> Mark Thomas & Co. Inc. is a California firm with its main office in San Jose, California, and <br /> branch offices in Sacramento, Walnut Creek, Fremont, Cupertino, Salinas and Redwood City. <br /> Since 1946, our firm has provided consulting engineering services for transportation, structural <br /> and municipal engineering; planning services for various government agencies and private <br /> enterprises; surveying and mapping; sanitary sewer and water system improvements, hydrology <br /> and hydraulic analysis and studies; and engineering management services. The company serves <br /> Northern California with a staff of over 160 professional, technical and clerical personnel. <br /> ProDosin~ Office: <br /> 90 Archer Street <br /> San Jose, California 95112 <br /> (408) 453-5373 <br /> (408) 453-5390 fax <br /> E-mail: (Pi ìniiial,first name last name)@~j.mth()nta~'.c(}m <br />2) Project Team <br /> Following are key team members proposed for construction staking support services: <br /> 0 Brad Leveen, PE Project Manager <br /> 0 Tom H. Milo, LS Survey Division Manager <br /> 0 David Jungman, LSIT Office Support <br /> 0 Octavio Soria Party Chief <br /> 0 Jim Hochgraef Party Chief <br /> 0 Hector Estrada Party Chief <br />3) Other Information: <br />Forms used by the survey crews in reporting survey cut sheet data and other relevant information <br />through the Resident Engineer to the construction Contractor, will follow the most current guidelines <br />established by Caltrans. The current Caltrans right of way and staking guidelines used by our surveyors <br />and office support staff, are as follows: <br /> 0' Caltrans, "Right Of Way Engineering, Surveys And Mapping Services Checklist For Special <br /> Funded Projects" <br /> 0' "Staking Information", Dated May 1999 provided by the Geometronic Branch of Caltrans <br />Quality Control Procedures are strictly followed on all of our projects. Sufficient independent field <br />checks will be made by the Party Chief to assure the integlity of the staking. The integrity of radial <br />stakeout set-up points will be verified before they are used by taking check shots on other velified <br />control points. All positions staked in the field will be checked against the computed positions and the <br />results will be recorded in the form of CTDC Stakeout Reports or on stakeout listings, such as slope <br />stake listings. <br />Proposal for Construction Staking Service., 3 <br />For RouteWl/Ralston interchange Prt!;ect <br /> "T .............. '"'-r-''''' ..·r-·..·..-·· '-" <br />