My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Mark Thomas
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Mark Thomas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 10:59:37 AM
Creation date
8/25/2003 10:46:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Co.
PROJECT NAME
Ralston Ave Marine Parkway Rt 101 interchange
RMP File Number
304
Date
7/30/2003
MO Ref
03-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 1 <br />Statement of Oualifications: <br />1) Descriotion of Firm/ResDOndinf! Office: <br /> Mark Thomas & Co. Inc. is a California firm with its main office in San Jose, California, and <br /> branch offices in Sacramento, Walnut Creek, Fremont, Cupertino, Salinas and Redwood City. <br /> Since 1946, our firm has provided consulting engineering services for transportation, structural <br /> and municipal engineering; planning services for various government agencies and private <br /> enterprises; surveying and mapping; sanitary sewer and water system improvements, hydrology <br /> and hydraulic analysis and studies; and engineering management services. The company serves <br /> Northern California with a staff of over 160 professional, technical and clerical personnel. <br /> ProDosin~ Office: <br /> 90 Archer Street <br /> San Jose, California 95112 <br /> (408) 453-5373 <br /> (408) 453-5390 fax <br /> E-mail: (Pi ìniiial,first name last name)@~j.mth()nta~'.c(}m <br />2) Project Team <br /> Following are key team members proposed for construction staking support services: <br /> 0 Brad Leveen, PE Project Manager <br /> 0 Tom H. Milo, LS Survey Division Manager <br /> 0 David Jungman, LSIT Office Support <br /> 0 Octavio Soria Party Chief <br /> 0 Jim Hochgraef Party Chief <br /> 0 Hector Estrada Party Chief <br />3) Other Information: <br />Forms used by the survey crews in reporting survey cut sheet data and other relevant information <br />through the Resident Engineer to the construction Contractor, will follow the most current guidelines <br />established by Caltrans. The current Caltrans right of way and staking guidelines used by our surveyors <br />and office support staff, are as follows: <br /> 0' Caltrans, "Right Of Way Engineering, Surveys And Mapping Services Checklist For Special <br /> Funded Projects" <br /> 0' "Staking Information", Dated May 1999 provided by the Geometronic Branch of Caltrans <br />Quality Control Procedures are strictly followed on all of our projects. Sufficient independent field <br />checks will be made by the Party Chief to assure the integlity of the staking. The integrity of radial <br />stakeout set-up points will be verified before they are used by taking check shots on other velified <br />control points. All positions staked in the field will be checked against the computed positions and the <br />results will be recorded in the form of CTDC Stakeout Reports or on stakeout listings, such as slope <br />stake listings. <br />Proposal for Construction Staking Service., 3 <br />For RouteWl/Ralston interchange Prt!;ect <br /> "T .............. '"'-r-''''' ..·r-·..·..-·· '-" <br />
The URL can be used to link to this page
Your browser does not support the video tag.