My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Shea Homes
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Shea Homes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2016 9:43:00 AM
Creation date
9/8/2003 1:16:13 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Shea Homes Limited Partnership
PROJECT NAME
DDA - Disposition and Development Franklin Street Project
RMP File Number
100
Date
10/28/1999
Reso Ref
RD-99-31
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Brian I(angas F. ulk <br /> <br />Description of Shared Infrastructure <br /> <br />[rvine .4partment Communities and Shea Homes - ,4ll Phases (at buildout) <br /> <br />[. Maple Street <br /> <br />=.4 *_. Re~mt~truc~ Map[e-: Sl. reet....hed~n FI- Ca~e~i,ev l~nl--qI~-~u,~::loin~. ~wers Board's <br /> CalTrain right-of-way. <br /> · Realign Maple Street at its inter~qtion with El Camino Real. <br /> · Close and barricade Lathrop Street at the intersection with Maple Street. <br /> · Provide a dedicated right and left mm lane on Maple Street at the El Camino intersection <br /> and provide a dedicated left turn lane from Maple Street onto Franklin Street. <br /> <br />II. Franklin Street <br /> <br />· Relocate Franklin Street between Maple Street and Monroe Street. <br />· Replace and narrow Franklin Street between Monroe Street and Jefferson Street. <br />· Modify the pedestrian crossing at the interse :ion of Franklin Street and Jefferson Street. <br /> <br />III. El Camino Real <br /> <br />· Modify the traffic signal medians and signing and striping at the intersection Of El <br /> Camino and the realigned Maple Street. <br />· Install frontago improvements on El Camino between Maple Street and Jefferson Street. <br />· Construct new curb cuts at the private street connecting to the Bekins building and <br /> Building 1A~,arking garage. <br />· Construct new curb cut at the new private streets (Madison and Jackson). Provide <br /> medians to allow right turn in and out of Madison, while continuing to allow and <br /> accommodate left tums from El Camino onto the south leg of Madison Street and from <br /> south Madison Street onto El Camino. <br /> <br />IV. Public Under,,round Utilitie, <br /> <br />A. Storm Drainage. _ <br /> <br /> · Install trunk line from the Redwood Creek outfall near Maple Street to the relocated <br /> Franklin Street. <br /> · Continue the trunk line in Franklin Street. Madison Street and Jackson Street. <br /> Accommodate and connect off-site piping at Madison Street. <br /> <br />- 540 Price Avenue · Rm:twood ~,ity. C,~ ~4063 · 1650} 482.63~0 · FAX (650} 482-6399 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.