Laserfiche WebLink
Brian K. Foulk <br /> <br />Construct a second trunk line in Franklin Street and Wilson Street to discharge into <br />the existing box culveta at CalTrain right-of-way. Accommodate and connect off-site <br />piping at Jefferson Street. <br /> <br />Water Line. <br /> <br />· Install a new 12" water line in Franklin Street between Jefferson Street and Maple <br /> Street. Connect the water line to the existing 8" water line in Maple Street and the <br /> existing 8" water line in Jefferson Street. <br />· Install a new 8" water line in the new private street between Bekins and Building IA <br /> and tie into the existing 12' water line on El Camino. This new water line will <br /> provide fire ~rotection. - ......... <br />· Connect to the existing 12" water line on El Camino at intersections with Madison <br /> and Jackson Street. '" <br /> <br />C. Sanitary Sewer. <br /> <br /> · Install new sewer line from the north end of Monroe Street to Franklin Street. <br /> Connect sewer in Franklin Street to existing manhole at Wilson Street. The existing <br /> Wilson Street sewer will remain. Abandon existing line in Monroe Street and along <br /> the CalTrain right, of-way. <br /> * Connect existing sewer lines at E1 Camino into new sewer lines in Madison and <br /> Jackson Streets. <br /> <br />- 540 Price Avenue · Re:hmmod f. ii'y. ~= 34063 · (650) 48 -2~6300 o FAX (650) 482-6399 <br /> <br /> <br />