Laserfiche WebLink
ITEM E - MODEL CALIBRATION ($5,626) <br /> The model calibration is divided into two calibration operations: a preliminary <br /> calibration of selected area of the water system and the final calibration of the <br /> entire water model. BKF will perform preliminary calibrations of two selected <br /> areas to evaluate the information used in the water model. Based on the <br /> findings of the preliminary calibrations, BKF will readjust the information of <br /> the entire water model. The preliminary calibration will also be used to <br /> gradually calibrate the model from the Hetch Hetchy line and water tanks to <br /> the bayfront area. The model preliminary calibration will be performed using <br /> the fire hydrant tests results provided by the City. <br /> <br /> BKF will perform the final calibration using the seasonal water demand <br /> associated with the time of year the hydrant tests are performed. We will <br /> provide h summary table of the calibration results. <br /> <br /> ITEM F - SCENARIOS ($4,268) <br />BKF proposes to evaluate three different scenarios under normal service <br />conditions and emergency service conditions. The normal service conditions <br />simulate the water system operating with the Hetch Hetchy line. The <br />emergency service condition simulates operation during an interruption of the <br />Hetch Hetchy line service, when the system would be supplied by the <br />emergency storage alone. This item includes the manipulation of the <br />information required by the scenarios, the management of the output <br />information and a cursory memo of the results. <br /> <br />We have assumed the scenarios will not require revisions to the calibration of <br />the water model describe above. <br /> <br />ITEM G - COMBINE MODELS ($9,312) <br />We understand that the City would also like to upgrade the existing water <br />model of the Redwood Shores area. BKF proposes to modify the RWS water <br />model using similar procedures describe above for the Redwood City water <br />model. In addition, we propose to combine the two water models into a one <br />comprehensive model for these two areas. <br /> <br />ITEM H - REPORT ($4,268) <br />BKF will prepare a summary of the findings made on the existing system <br />operation and three scenarios evaluated. The report will identify the critical <br />areas of the water system simulated based on the City hydraulic design criteria <br />and a map of the water model. <br /> <br />ITEM G - REIMBURSABLE ($1,881) <br />We recommend a budget of approximately 5% of the design fee for <br />reimbursable expenses. All reimbursables will be billed with a 10% mark up. <br />Reimbursable include plotting reproduction costs and express delivery costs. <br /> <br /> <br />