My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Winzler & Kelly
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Winzler & Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 4:19:17 PM
Creation date
6/7/2011 4:19:14 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Winzler & Kelly
PROJECT NAME
Pump Station No. 25 Improvements Project
RMP File Number
304.5
Date
6/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4■&.' W INZLER.KELLY <br /> March 30, 2011 EXHIBIT A <br /> Mr. Jimmy Tan, P.E. <br /> City of Redwood City <br /> 1017 Middlefield Road <br /> P.O. Box 391 <br /> Redwood City, CA 94064 <br /> RE: PUMP STATION NO. 25 IMPROVEMENTS PROJECT <br /> Dear Mr. Tan: <br /> Winzler & Kelly is pleased to provide this proposal to the City of Redwood City for professional <br /> services related to the Pump Station No. 25 Improvements Project. <br /> PROJECT UNDERSTANDING <br /> Pump Station No. 25 was constructed in 1997 to serve the flows generated from the Westport <br /> Office Park. The existing pump station structures consist of the concrete wet well located <br /> adjacent to a vault containing flexible couplings and a separate valve vault. The flexible <br /> coupling vault adjacent to the wet well has settled slightly. In lieu of performing a geotechnical <br /> investigation to evaluate options for mitigating the settlement of the flexible coupling vault, the <br /> City has elected to eliminate the vault and replace the existing flexible couplings with direct <br /> buried flexible expansion joints. <br /> In general, the project includes four primary project elements. These elements include: 1) Pump <br /> Station No. 25 wet well concrete repair and re- lining; 2) demolition of the flexible coupling vault <br /> adjacent to the Pump Station No. 25 wet well; 3) replacement of the existing flexible coupling <br /> assemblies with direct buried flexible expansion joints; and 4) Installation of Flygt "Safe- Hatch" <br /> safety hatches at 17 pump station wet wells within the City of Redwood City. <br /> Our proposal and fee is outlined below for your consideration: <br /> SCOPE OF WORK <br /> Task 1 - Project Management, QA/QC and Client Meetings <br /> This task includes project administration, coordination, attending meetings and quality control as <br /> stated in the following sub - sections: <br /> Task 1.1 Project Coordination and Administration <br /> Winzler & Kelly will provide project coordination; we will communicate project issues with the <br /> City, develop a project work plan and schedule (which will be updated as necessary), track and <br /> report on Work progress. <br /> 417 Montgomery Street, Suite 700, San Francisco, CA 94104 <br /> Tel 415.283.4970 fax 415.283.4980 <br /> www.w - and -k.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.