_ 4 WINZLER■Ss_ KELLY City of Redwood City <br /> March 30, 2011 <br /> Page 2 <br /> Task 1.2 Quality Assurance / Quality Control <br /> A Senior Principal with Winzler & Kelly will perform QA/QC reviews of milestone deliverables. <br /> Task 1.3 Provide Narrative Progress Reports <br /> Our Project Manager will prepare and submit narrative progress reports with each invoice that <br /> address specific accomplishments during the reporting period; problems encountered or <br /> anticipated and recommended solutions; results of any significant activities; specific details <br /> focusing on any problems or issues affecting the project design, scope, budget or schedule. <br /> Task 2 — Review Background Information and Prepare 30% Preliminary Design <br /> Memorandum <br /> The purpose of this task is to present the preliminary design concepts, proposed installation <br /> methods, and associated costs for City review and selection. The Preliminary Design <br /> Memorandum will include typical details as appropriate and will provide the basis for the Final <br /> Design. <br /> Task 2.1 Review Existing Pump Station Background Information <br /> Winzler & Kelly will review existing pump station background information. This review will <br /> include site visits to each of the 17 pump station sites to document existing conditions. <br /> Task 2.2 Prepare Preliminary Design Memorandum <br /> Winzler & Kelly will develop an alternative pipe configuration to replace the existing flexible <br /> coupling assemblies with direct buried flexible expansion joints and eliminate the pump Station <br /> No. 25 flexible coupling vault. <br /> We will also develop the basis for the Pump Station No. 25 relining work which will involve <br /> removal of existing T -Lock lining, concrete repair and relining with a high -build epoxy or <br /> polyurethane -type protective lining product. Typical details will be prepared showing the <br /> demolition of existing hatches and installation of Flygt "Safe- Hatches" at the 17 pump station <br /> sites. <br /> The Preliminary Design Memorandum will document the results of the work described above. A <br /> table of contents of specifications will be included in the Preliminary Design Memorandum <br /> along with an Engineer's Opinion of Probable Construction Costs. Winzler & Kelly' s key staff <br /> will meet with City staff, following the City's review of the Preliminary Design Memorandum, <br /> to review the City's comments and questions and to come to consensus on the design elements <br /> prior to commencing the Final Design. <br /> Deliverables: Preliminary Design Memorandum — Submit FIVE (5) copies to the City <br /> for review. <br />