My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Winzler & Kelly
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Winzler & Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 4:19:17 PM
Creation date
6/7/2011 4:19:14 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Winzler & Kelly
PROJECT NAME
Pump Station No. 25 Improvements Project
RMP File Number
304.5
Date
6/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> WINZLER(SLKELLY City of Redwood City <br /> March 30, 2011 <br /> Page 3 <br /> Task 3 — Final Design (100% Submittal) <br /> This Final Design Submittal (100 %) will be prepared based on City's direction provided in <br /> Task 2.2 above. The Plans, Specifications, and Engineer's Estimate of the Probable <br /> Construction Cost (Bid Documents) will be submitted to the City for its use in preparing a bid <br /> package. <br /> Task 3.1 Prepare 100% Bid Document Submittal <br /> Winzler & Kelly will prepare the 100% submittal package consisting of site plan, demolition <br /> drawings, general and construction notes, connection details, structural details, technical <br /> specifications and an engineer's estimate of the probable construction cost. The 100% submittal <br /> package will be submitted to the City for review and approval. <br /> Plans will be prepared at a scale of 1 " =20' (unless otherwise approved by the City). It is <br /> anticipated that the following plan sheets (10 total sheets) will be included in the 100% <br /> submittal: <br /> Sheet Description <br /> Site Plan and Notes — (2) <br /> Hatch Demolition/Replacement Plans (using existing as -built images) — (2) <br /> Hatch Replacement Typical Details — (2) <br /> Pump Station #25 Plan/Elevation — (1) <br /> Piping Details — (1) <br /> Structural Details — (1) <br /> Wet Well Repair and Relining Details — (1) <br /> Assumptions: <br /> • AutoCAD layouts will not be developed for the seventeen (17) pump stations. The City <br /> will provide electronic ( tij images of the pump station as- builts which will be used as a <br /> background for the development of demolition/hatch replacement details. <br /> • No additional improvements will be designed at the pump stations other than Pump <br /> Station #25. <br /> • Geotechnical investigations to determine the extent and cause of settlement are excluded <br /> from this scope of work.. <br /> • The City of Redwood City will provide all front end documents and compile the bid <br /> package. <br /> Deliverables: 100% Plans — Submit FIVE (5) copies of half -size plans to the City for review <br /> and approval. <br /> 100% Specifications — Submit FIVE (5) copies of Project Specifications <br /> 100% Estimate of Probable Construction Costs — Submit THREE (3) updated <br /> copies to the City for review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.