My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2011-058172
RedwoodCity
>
City Clerk
>
Recorded Docs 2010-2012
>
2011
>
RecDoc 2011-058172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 1:38:08 PM
Creation date
6/8/2011 1:38:05 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance Agmt
Doc Num
2011-058172
Rec Date
5/24/2011
Address
Lots 2 and 4 "The Preserve at Redwood Shores" filed 8/26/2008 Book 136
Parties
The Preserve Townhomes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Preserve Townhomes <br /> Exhibit C <br /> Stormwater Treatment Measure Operation and Maintenance <br /> Inspection Report to the City of Redwood City, California <br /> This report and attached Inspection and Maintenance Checklists document the inspection <br /> and maintenance conducted for the identified stormwater treatment measure(s) subject to <br /> the Maintenance Agreement between the City and the property owner during the annual <br /> reporting period indicated below. <br /> I. Property Information: <br /> Property Address or APN: Intersection of Salt Court / Marine Parkway and Intersection <br /> of Shearwater Parkway / Keech Drive, Redwood City, CA <br /> Property Owner: KB Home South Bay Inc., a California Corporation and <br /> The Preserve at Redwood Shores Owners' Association, a Nonprofit Mutual Benefit <br /> Corporation <br /> 11. Contact Information: <br /> Name of person to contact regarding this report: Chuck Humpal (BKF Engineers) <br /> Phone number of contact person: (650) 482 -6320 Email: chumpal @bkf.com <br /> Address to which correspondence regarding this report should be directed: <br /> 255 Shoreline Drive, Suite 200 <br /> Redwood City, California 94065 <br /> 111. Reporting Period: <br /> This report, with the attached completed inspection checklists, documents the inspections <br /> and maintenance of the identified treatment measures during the time period from <br /> to <br /> IV. Stormwater Treatment Measure Information: <br /> The following stormwater treatment measures (identified treatment measures) are located <br /> on the property identified above and are subject to the Maintenance Agreement: <br /> Identifying Type of Treatment Measure Location of Treatment Measure on the <br /> Number of Property <br /> Treatment <br /> Measure <br /> S #1 Vegetated Swale, including Bubble -Up Between Building 19 and Seacrest Lagoon <br /> Structure and Overflow /Outlet Structure <br /> Page 1 O &M Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.