Laserfiche WebLink
r <br /> The Preserve Townhomes <br /> S #2 Vegetated Swale, including Bubble -Up Between Building 6 and School Property <br /> Structure and Overflow /Outlet Structure <br /> S #3 Vegetated Swale, including Bubble -Up Between Building 25 and Marine Parkway <br /> Structure and Overflow /Outlet Structure <br /> SP #1A Sump Pump Manhole Between the end of Whidbey Lane and <br /> Seacrest Lagoon <br /> SP #1B Sump Pump Manhole Betweeen the end of Bethel Lane and <br /> Seacrest Lagoon <br /> SP #2 Sump Pump Manhole Near parking area on Bremerton Circle <br /> SP #3 Sump Pump Manhole Near entrance to Salt Court site <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Performed and Date(s) Conducted <br /> Treatment <br /> Measure <br /> Page 2 O &M Inspection Report <br />