Laserfiche WebLink
6.1.C. - Page 3 <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that the 2010-2011 Spot <br /> Repair and Overlay Project meets the CEQA exemption criteria as set forth in Section <br /> 15302, ("Replacement or Reconstruction"). Furthermore, this project has been <br /> designed complaint with the city's Engineering Standards and accepted practices. <br /> ATTAC H M E N TS <br /> Project Location Maps <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> 1. Contract Documents <br /> 2. Bid Documents <br /> CHU CHANG, PE, LEED AP <br /> ENGINEERING&TRANSPORTATION MANAGER <br /> ROBERT B. BELL <br /> CITY MANAGER <br />