My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-12-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-12-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:49:37 PM
Creation date
12/9/2004 3:12:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
12/13/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 8--13 <br /> The plan is a policy document, meant to guide the implementation of the plan, but will also allow <br /> sufficient flexibility for the Agency to respond to specific redevelopment opportunities as they <br /> arise. <br /> The non-housing sections of this implementation plan cover the period from January 1, 2005 <br /> through December 31, 2009. <br /> The sections that describe implementation of housing production, and replacement <br /> requirements address a ten-year compliance period from January 1, 2005 through <br /> December 31, 2014. <br /> The sections addressing housing fund expenditures targeting requirements for very low and <br /> low households and non households address an extended initial 13 <br /> compliance period from January 1, 2002 through December 31, 2014. <br /> C. Project Area Descriptions and Blighting Conditions , <br /> Redevelopment Project No. 2 is comprised of three non-contiguous sub-areas totaling <br /> approximately 1,016 acres in the generally northern section of Redwood City. The original <br /> project area was adopted in 1982, consisted of 332 acres, and encompassed four sub-areas: <br /> the Gateway, Centre, Marina and Seaport. The plan was amended in 1985 to add 4.26 acres to <br /> the Gateway subarea. A second amendment in 1989 resulted in the Gateway and Centre <br /> subareas being combined into a new "Downtown° sub-area and the addition of 680 acres to the <br /> newly identified Downtown sub-area. A profile of the Project Area including plan limits and <br /> acreages is provided on Table 1. The boundaries of the Project Area are shown on the <br /> following map. <br /> The plan for all three areas' showed that they shared similar blight characteristics, such as <br /> defective design and character of physical construction, residential overcrowding, small or <br /> irregular lots, inadequate public improvements, and varying degrees of social and economic <br /> maladjustments. These blight cor�ditions are described in more detail below: <br /> 1. Historic Blighting Conditions — Original Project Area <br /> At the time of the Plan Adoption, the properties in this Project Area were improved and partially <br /> improved with a mixture of commercial, railroad, industrial and residential uses, as well as <br /> various public or quasi-public open space. Many of the sites were under different ownership <br /> and/or tenant leases, and in some cases, were subject to deed restrictions, which inhibited their <br /> development. In general, the properties were affected by conditions such as economic <br /> dislocation, deterioration and disuse resulting from faulty planning, the subdivision and sale of <br /> lots of irregular form and shape and inadequate size for usefulness and development, and a <br /> � Referring to the original project area and the two phases of territory added by amendment <br /> Keyser Marston Associates, Inc. <br /> 18610.001 \030-003; 12/6/2004; DRAFT <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.