My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�. A- <br /> � BB. Cumulative (20201 Imaact on Eastbound SR 84. Wtllow Road to <br /> �';" Universiri Avenue and Universitv Avenue to the Counri Line <br /> Seqments — PM Peak Hour <br /> Potential Impact: By 2020, assuming the addition af traffic generated by <br /> all other approved and pending projects in the vicinity, the P%ect is expected to <br /> increase tra�c volumes by more than one percent of capacity on Eastbound SR 84, <br /> Willow Road to University Avenue and University to County Line segments, during the <br /> PM peak hour, a period during which tra�c volume would already be expected to <br /> exceed capacity on these segments even absent the addition of Project-generated <br /> traffic (Impact 7-27). <br /> Mitigation: The project applicant shall design and implement a <br /> comprehensive TDM program meeting the criteria set foRh in Mitigation 7-2 (Mitigation <br /> 7-27). <br /> Findings: Mitigation 7-27 is feasibie and wili help to partially mitigate <br /> Impact 7-27. However, mitigation of this impact to a less-than-signficant level would <br /> require the addition of another eastbound through lane to these freeway segments, <br /> which is not feasible because this freeway widening would require multiple approvals <br /> from multiple jurisdictions beyond the authority of the City and would require resources <br /> beyond the capacity of any individual development project or the City. Therefore, the <br /> � cumulative impact described above is significant and unavoidable. <br /> M� <br /> C <br /> V. BIOLOGICAL RESOURCES <br /> A. Steelhead and Chinook Salmon <br /> Potential Impact: The Project would fill approximately 10 acres of <br /> estuarine habitat for listed species of steelhead and Chinook salmon, and construction <br /> activity could cause increased water turbidity, contaminant refease, noise and <br /> underwater shock waves within such habitat (Impact 8-1). <br /> Mitigation: The Project would be required to obtain a Section 404 pertnit <br /> from the Army Corps of Engineers and a section 401 permit from the Regional Water <br /> Quality Control Board, and may be required to obtain a Streambed Alteration <br /> Agreement from the California Department of Fish and Game, and would be required to <br /> comply with all conditions of those permits/agreements (Mitigation 8-5). The conditions <br /> would include a Habitat Mitigation and Monitoring Plan approved by all necessary <br /> agencies, and the HMMP would include a plan to replace or otherwise mitigate the loss <br /> of estuarine habitat. The HMMP would also include measures spec�ed in Mitigation <br /> Measure 8-1, concerning silt, turbidity, dust, dredging and pile driving. <br /> Findings: Obtaining of the specified permits and implementation of the <br /> HMMP would reduce the potential impact of loss of estuarine habitat and disturbance of <br /> habitat for protected steelhead and Chinook salmon species, otherwise potentially <br /> 1289\02�179278.2 20 <br /> ANy/Reso/Reso.7470 , . <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.