Laserfiche WebLink
�.��� <br /> .•-- provide fee or other funding for dredging necessary to maintain navigability of the <br /> � project reach of Redwood Creek where affected by the Project (Mitigation 9-4). <br /> Findings: Attaining a near-self-scouring condition and maintaining <br /> navigability of an affe�ted portion of Redwood Creek are feasible and wo�1d reduce <br /> permanent sedimentatio�� impacts on the marina iniet channels and the project ceach of <br /> Redwood Creek, otherwise potentially environmentally significant, to a less than <br /> significant level. � <br /> VII. INFRASTRUCTURE AND PUBLIC SERVICES <br /> A. Municiaal Water Service Demand <br /> Potential Impact: It is anticipated that the Project will increase demand <br /> for municipal water service in the approximate amounts stated in Impact 10-1 at a time <br /> when Redwood City already exceeds its contracted allocation of water from the San <br /> Francisco Public Utilities Commission by approximately 1,000 acre-feet annually, and is <br /> predicted to exceed its allocation by approximately 2,700 acre-feet annually by 2009. <br /> The Project would have an estimated water consumption per day about 25,600 gallons, <br /> or about 6%, greater than the Initial Project, which does not materially change the water <br /> supply impact or mitigation analysis. The City does not currenUy have sufficient water <br /> supply to meet the projected water demands of the Project together with those of its <br /> existing customers and the demands of other planned development. <br /> Mitigation: State law requires that prior to City approval of any tentative <br /> map or development agreement for the Project, the City Public Works Services <br /> Department must complete a water supply analysis that demonstrates that sufficient <br /> water will be available to serve Project needs. The project applicant shall aiso be <br /> required to comply with all applicable and future local water demand performance <br /> standards (Mitigation 10-1). <br /> Findings: Mitigation 10-1 is feasible and could be expected to <br /> substantiaily lessen or fully mitigate the water service impacts of the Project. However, <br /> prior to completion of the water supply analysis described above, it is impossible to <br /> know which measures will be required and implemented in response to the water supply <br /> analysis. It is not feasible at this time to identify or analyze spec�c mitigation measures <br /> adequate to substantially or fully lessen the water service impacts of the Project. Thus, <br /> these impacts will be treated as significant unavoidable impacts of the Project. <br /> B. Sewer Service <br /> Potential Impact: The Project would increase sewage generation at a <br /> time when the South Bayside System Authority (the "SBSA") treatment capacity <br /> allocation to Redwood City is already being exceeded, as more fully described in Impact <br /> 10-2. <br /> 1289\02N792782 26 . . <br /> Atty/Reso/Reso.1470 . <br /> 052004 <br />