My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�• f ���Q� <br /> ,,,,-�-,,;,, Findings: The mitigation measure iden6fied above is feasible and <br /> G"� � reduces the potentially significant environmeMal impact described above to a less-than- <br /> significant level. <br /> F. Erosion and Sedimentation <br /> Potential Impact: Soils eroded during Project construction could wash <br /> directly or indirectly into Redwood Creek or Smith Slough, potentially causing <br /> sedimentation, increased flooding potential and maintenance problems and also <br /> potentially degrading water quality in the creek, slough and marinas by increasing <br /> turbidity (Impact 11-6). __ <br /> Mitigation: The Project shall prepare and implement during construction <br /> an erosion control plan approved by the City and consistent with the required Project <br /> Stormwater Pollution Prevention Plan, with provisions consistent with Mitigation <br /> Measure 11-6. <br /> Findings: Mitigation Measure 11-6 is feasible and reduces sedimentation <br /> and turbidity to less than significant levels. <br /> IX. PUBLIC HEALTH AND SAFETY <br /> ,- Potential Impact: The Project would lead to new development and <br /> several thousand residents within the San Carlos Airport pianning area, potentially <br /> affecting operation of the San Carlos Airport and presenting potential nuisance issues <br /> (Impact 12-1). <br /> Mitigation: The Project shall be reviewed by the City/County Association <br /> of Governments and the Federal Aviation Administration, and shall conform to <br /> conditions imposed within the jurisdiction of those agencies to ensure that navigation is <br /> not obstructed and that awareness measures are taken so that residents know about <br /> and acknowledge potential nuisarce and safety issues which could affect them <br /> (Mitigation Measure 12-1). <br /> Findings: Mitigation Measure 12-1 is feasible and will eliminate any <br /> potential significant hazards and reduce potential effects on operation of the San Carlos <br /> Airport and potential nuisance and safety issues for residents to levels of insignificance. <br /> X. NOISE AND VIBRATION <br /> A. Residential Noise Exaosure <br /> Potential Impact: Upper story residences at the Project would be <br /> exposed to unshielded freeway and aviation noise in excess of applicable standards <br /> (Impact 13-1). <br /> 1289\02�779278.2 32 <br /> Atty/Reso/Reso.1470 . <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.