Laserfiche WebLink
���� <br /> ,�, Findings: The mitigation measure identified above is feasible and <br /> ��= reduces the potentially significant environmental impact described above to a less-than- <br /> significant IeveL <br /> C. Ground Shakinq <br /> Potential Impact: The F'roject would place new residen;.es and <br /> businesses in an area that is expected to have severe earthquakes during the Iffe of ttie <br /> Project (Impact 11-3). <br /> Mitigation: The design level investigations required by Mitigation 11-1 <br /> and Mitigation 11-2 shall include analysis of site seismic stability, evaluation of <br /> liquefaction potential and soil response characteristics with respect to ground <br /> acceleration, as described in Mitigation 11-3. Recommendations from these <br /> investigations shall be incorporated into Project grading and foundation plans (Mitigation <br /> 11-3). <br /> Findings: The mitigation measure identified above is feasible and <br /> reduces the potentially significant environmental impact described above to a less-than- <br /> significant IeveL <br /> D. Groundwater <br /> -. Potential Impact: Project excavation may be affected by high <br /> ` groundwater and/or the shallow depth of Bay mud (Impact 11-4). <br /> Mitigation: The design-level investigations required by Mitigation 11-2 <br /> and Mitigation 11-2 shall include analyses of, and make recommendations in <br /> accordance with Mitigation 11-4 concerning, groundwater and Bay mud within the limits <br /> of all foundation and utility construction. Project grading and construction plans shall <br /> incorporate these recommendations and the results of these analyses (Mitigation 11-4). <br /> Findings: The mitigation measure identified above is feasible and <br /> reduces the potentially significant environmental impact described above to a less-than- <br /> significant level. <br /> E. Corrosive Soils <br /> Potential Impact: Soii on the Project site is classified as "severely <br /> corrosive" and could damage foundations and underground utilities (Impact 11-5). <br /> Mitigation: The design-level investigations required by Mitigation 11-1 <br /> and Mitigation 11-2 shall evaluate corrosive soils within the limits of all foundation and <br /> utility construction and make recommendations with respect to corrosive soils in <br /> accordance with Mitigation 11-5. <br /> 1289102�17s278.2 31 <br /> Atty/fieso/Reso.1470 <br /> 052004 <br />