My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
���� <br /> ,�, Findings: The mitigation measure identified above is feasible and <br /> ��= reduces the potentially significant environmental impact described above to a less-than- <br /> significant IeveL <br /> C. Ground Shakinq <br /> Potential Impact: The F'roject would place new residen;.es and <br /> businesses in an area that is expected to have severe earthquakes during the Iffe of ttie <br /> Project (Impact 11-3). <br /> Mitigation: The design level investigations required by Mitigation 11-1 <br /> and Mitigation 11-2 shall include analysis of site seismic stability, evaluation of <br /> liquefaction potential and soil response characteristics with respect to ground <br /> acceleration, as described in Mitigation 11-3. Recommendations from these <br /> investigations shall be incorporated into Project grading and foundation plans (Mitigation <br /> 11-3). <br /> Findings: The mitigation measure identified above is feasible and <br /> reduces the potentially significant environmental impact described above to a less-than- <br /> significant IeveL <br /> D. Groundwater <br /> -. Potential Impact: Project excavation may be affected by high <br /> ` groundwater and/or the shallow depth of Bay mud (Impact 11-4). <br /> Mitigation: The design-level investigations required by Mitigation 11-2 <br /> and Mitigation 11-2 shall include analyses of, and make recommendations in <br /> accordance with Mitigation 11-4 concerning, groundwater and Bay mud within the limits <br /> of all foundation and utility construction. Project grading and construction plans shall <br /> incorporate these recommendations and the results of these analyses (Mitigation 11-4). <br /> Findings: The mitigation measure identified above is feasible and <br /> reduces the potentially significant environmental impact described above to a less-than- <br /> significant level. <br /> E. Corrosive Soils <br /> Potential Impact: Soii on the Project site is classified as "severely <br /> corrosive" and could damage foundations and underground utilities (Impact 11-5). <br /> Mitigation: The design-level investigations required by Mitigation 11-1 <br /> and Mitigation 11-2 shall evaluate corrosive soils within the limits of all foundation and <br /> utility construction and make recommendations with respect to corrosive soils in <br /> accordance with Mitigation 11-5. <br /> 1289102�17s278.2 31 <br /> Atty/fieso/Reso.1470 <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.