My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
����� <br /> �., Mitigation: The Project shall retain a qualified archaeologist to monitor <br /> C�:;~" Project-related ground-disturbing activities. in the event that subsurface cultural <br /> resources are encountered during such activities, work in the immediate vicinity shall be <br /> Stopped, the retained archaeoloqist shall evaluate the finds, and the Project shall <br /> ii�plement the measures set forth i,� Mitigation 14-1. <br /> Findings: Implementation of Mitigation 14-1 will reduce the significance <br /> of the ProjecYs potential impact to cultural and historic resources to a less-than- <br /> significant level. <br /> XII. AIR QUALITY <br /> A. Construction Emissions <br /> Potential Impact: Project construction activities would generate exhaust <br /> emissions and fugitive particulate matter emissions that would affect local air quality <br /> (Impact 15-1). <br /> Mitigation: The Project shall be required to implement fugitive dusX <br /> control measures recommended by the Bay Area Air Quality Management District and <br /> described in Mitigation 15-1. <br /> Findings: Implementation of Mitigation 15-1 will reduce the air quality <br /> ' impacts related to construction emissions to a less-than-significant level. <br /> B. Proiect and Cumulative Impacts on Reaional Emissions <br /> Potential Impact: The additional vehicular traffic generated by the <br /> Project would produce regional emissions exceeding Bay Area Air Quality Management <br /> District thresholds of significance for reactive organic gases, nitrogen oxide and PM10 <br /> (impact 15-2). <br /> Mitigation: The Project shall implement the transportation demand <br /> management mitigations identified in Chapter 7 of the FEIR and shall require office, <br /> retail, and residential components of the Project to implement additional mitigation <br /> measures to encourage pedestrian, bicycle,.and transit modes of travel, as more fully <br /> described in Mitigation 15-2. <br /> Findings: Implementation of the measures described in Mitigation 15-2 is • <br /> expected to reduce Project emissions by approximately fifteen percent. However, it is <br /> not feasible to reduce Project-generated traffic to a level which does not increase <br /> emissions by a significant amount, so that even with implementation of these measures, <br /> the impact of Project-associated emissions is expected to remain at a significant level <br /> and to contribute to a significant unavoidable cumulative impact. <br /> 1289\02N792782 34 <br /> AttylReso/Reso.�470 <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.