Laserfiche WebLink
��'�`rlY <br /> �, Peninsula's housing shortage, which cuRenUy prices many city <br /> �'�' and county employees out of the area; <br /> • Create a community that invites and encourages residents and the <br /> genei�al public to enjoy the San Francisco Bay and the �Zair Island <br /> Wildlife Refuge through new public access and communit �-serving <br /> amenities such as restaurants, offices, retail, community centers, and <br /> overlooks; and <br /> • Create a watertront project that provides access to San Francisco Bay <br /> for residents and the public via integrated walkways, intemal <br /> waterways, and marinas. <br /> Based on the foregoing and the discussion in Section 17.1 of the FEIR, the City finds <br /> that, on balance, the Project provides substantially greater public benefits than the No <br /> Project Alternative and that the No Project Alternative is not a feasible altemative to the <br /> Project. <br /> B. Buildout Under Existinq Generai Plan And Zonina — Maximum <br /> Residential Plus Commercial (Alternative 2) <br /> Description: Alternative 2 assumes that the Project site would be <br /> developed with the maximum number of residential units permissible under existing <br /> ��= General Plan and zoning provisions for the site. Under Alternative 2, the Pete's Harbor <br /> portion of the site would be developed exclusively with residential uses at the maximum <br /> allowable residential density of 40 dwelling units per net acre, for a total of 462 <br /> residential units. The Peninsula Marina portion of the site would be developed with <br /> o�ce and general retail uses only for a total of approximately 898,000 square feet of <br /> commercial floor area, including approximately 20,000 square feet of retail-restaurant <br /> floor area and 878,000 square feet of office floor area. <br /> Findings: Alternative 2 would substantially reduce the environmental <br /> impacts of the proposed Project in the areas of land use, visual factors, biological <br /> resources, infrastructure and public services, soils and geology, public health and <br /> safety, noise, and cultural and historic resources. In all of these areas, howeve�, <br /> Alternative 2 would still have significant environmental impacts requiring mitigation. In <br /> the area of transportation and circulation, the environmental impacts of Alternative 2 <br /> wouid actuaily be slightly increased over those of the proposed Project. Impacts in the <br /> areas of hydrology and water quality and air quality would be similar to those associated <br /> with the Project. With respect to population, housing and employment, Alternative 2 <br /> would contribute substantially to the existing citywide imbalance between residents and <br /> jobs, resulting in incressed in-commuting. Alternative 2, which would produce 76 <br /> percent fewer residential units than the proposed Project, would not attain the Project <br /> objectives identified in the discussion of the No Project Altemative above and in the <br /> FEIR. It wouid not sufficiently address the market demand for housing or provide more <br /> housing at a variety of affordability levels. It would also reduce Project revenue so that <br /> 1289\02\179278.2 36 <br /> Atty/Reso/Reso.1470 <br /> 052004 <br />