Laserfiche WebLink
�A�� <br /> r , ; , ; � Findings: As compared to the Initial Project, Altemative 4—like the <br /> �- :-- Project– would result in reduced, but stili significant, environmental impacts in the areas <br /> of land use, transportation and circulation, biologicai resources, hydrology and water <br /> quality, and infrastructure and public servi�es. Environmental impacts in the areas of <br /> visual factors; soils and geology, public heaith and safety, noise, cultural resources, and <br /> air quality wo��ld be similar to those associ�ted with the Initial Project and—wfth the <br /> exception of visual impacts, where Altemative 4 would have greater effects than the <br /> Project—similar to those of the Project. With respect to population, housing and <br /> employment, Alternative 4 would, if feasible, have housing benefits similar to those of <br /> both the Initial Project and the Project and, compared to the Initial Project, a similar but <br /> increased positive effect on the existing citywide imbalance between jobs and employed <br /> residents, reducing in-commuting. However, the reduction in marina fill under <br /> Alternative 4 also reduces the land area available for residential structures, making it <br /> very di�cult to achieve fundamental project objectives, including meeting housing <br /> demand and providing affordable housing, and is, therefore, not be a feasible altemative <br /> to the,Project. <br /> E. Reduced Commerciai. with Reduced Buildina Heiahts Reduced <br /> Marina Fill, and Added Park (Alternative 51 <br /> Description: Alternative 5 assumes development of the Project site along <br /> lines similar to those described for Alternative 4 but with the addition of a neighborhood <br /> park. Accordingly, Aiternative 5 would include development of 1,930 condominium <br /> residential units for sale, 162,000 square feet of commercial floor area, including <br /> 150,000 square feet of office space and 12,000 square feet of convenience retail, and a <br /> three-acre neighborhood park. Altemative 5 would include approximately fifteen multi- <br /> story residential structures (two more than the Initial Project) and a reduction in <br /> maximum residential structure height from 260 feet to 190 feet. It would involve more <br /> marina fill than the Project but less than the Initial Project (approximately 11 acres for <br /> Alternative 4 as opposed to approximately 11.54 acres for the Initial Project and 10 <br /> acres for the Project). <br /> Findings: As compared to the Initial Project, Altemative 5—like the <br /> Project-- would result in reduced, but still significant, impacts in the areas of visual <br /> factors, transportation and circulation, biological resources, and hydrology and water <br /> quality. Environmental impacts in the areas of land use, infrastructure and public <br /> services, soils and geology, public health and safety, noise, cultural resources, and air <br /> quality wouid be similar to those associated with the Initial Project and the Project. With <br /> respect to population, housing and employment, Alternative 5, if feasible, would have <br /> housing benefits similar to those of both the Initial Project and the Project and, <br /> compared to the Initial Project, a similar but increased positive effect on the existing <br /> citywide imbalance between jobs and employed residents, reducing in-commuting. <br /> Alternative 5 would also reduce the maximum height of residential structures to 190 <br /> feet. However, this height reduction, as well as incorporation of the three-acre <br /> neighborhood park, significantly reduces the land area available for construction of <br /> residential structures, making it very difficult to achieve fundamental project objectives, <br /> i 2as�o2�i �sz�az 38 <br /> Atty/Reso/Reso.1470 . <br /> 052004 <br />