My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
��-�R <br /> ,� including meeting housing demand and providing affordable housing, and is, therefore, <br /> _. not be a feasible altemative to the Project. � <br /> F. Reduced Commercial, with Reduced Buildina Heis�hts. Reduced <br /> Mariaa Fill. Adde�i Hotel, Imaroved Desiqn. Increased Retail and <br /> Incor�oration of Bsvfront Studv Transit and Transoortation Demand <br /> Manaqement (TDM) Measures (Alternative 6) <br /> Description: Alternative 6 assumes that the Project site would be <br /> developed as a mixed use residential-commercial complex similar to the Initial Project, <br /> with the same residential unit total, but with a redesign that would include modifications <br /> f _ in building heights and building placement to substantially reduce visual impacts, an <br /> - increase in the amount of commercial floor area devoted to local-serving convenience <br /> retail to "internalize" more vehicular trips and thereby reduce tra�c impacts, the addition <br /> of a 200-room hotel, and the incorporation of additional specific transit provisions and <br /> TDM measures (recommended in the City's Bayfront Study) to reduce peak period <br /> vehicular trips. Accordingly, Alternative 6 wouid include up to1,930 condominium <br /> residential units for sale (the same as the Initial Project), and a reduction in commercial <br /> floor area from 312,000 square feet (the Initial Project) to 175,000 square feet, including <br /> 25,000 square feet of service retail (as opposed to 12,000 square feet under the Initial <br /> Project). Alternative 6 would include more multi-story structures (seventeen residential <br /> buildings and one hotel "tower") than the Initial Project (thirteen towers), although the <br /> maximum residential structure height would be reduced from 260 feet to 240 feet, and <br /> the maximum height at the Peninsula Marina portion of the site would be further <br /> — reduced to 205 feet. Alternative 6 would also result in less marina fill (approximately 10 <br /> acres) than the Initial Project (approximately 11.54 acres). <br /> :� Findings: Altematives 4, 5 and 6 are similar in number of residential units <br /> '(1930) and commercial (o�ce) square footage (154000 square feet). _Altemative 6 <br /> contains an additional 12,500 square feet of retail space (which, under the Project <br /> Development Agreement, would have to be timely developed to permit full residential <br /> development); and allows a hotel of up to 200 rooms, which would not be included in <br /> the Initial Project, Alternative 4 or Alternative 5, as. weil as a number of significant <br /> design improvements. - <br /> The additionat retail space and develoRment reconfiguration elements of <br /> Alternative 6 are feasible measures which significantly reduce traffic generation visual <br /> impacts., - ' � <br /> = Peak traffic for the hotel will not occur at the same times as peak traffic <br /> from the rest of the Project. Therefore, inclusion of the hotel will not substantially <br /> increase potential environmental impacts. The proposed hote� wiil also provide <br /> significant economic development benefits to the _;City. The City has, therefore,' <br /> :- determined that incorporating features of Alternative 6, with the hotel, provides the <br /> greatest feasible reduction of potentj�l �nvirQnmental impacts ,of any identrfied <br /> alternative for the Project. ` _ ', <br /> 1289\0211792782 gg � <br /> Atty/Reso/Reso.1470 . � <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.