Laserfiche WebLink
Marins Shores Village Proje�t Fnal EIR <br /> May 1 8R 2 edwood CftY MltlgaUon MoNtoting C <br /> �'] 9 <br /> Attachment 3 .i �� <br /> ,�� � <br /> MARINA SHORES VILLAGE PROJECT-- <br /> MITIGATION MONITORING CHECKLIST <br /> 1. ATTACHED MITIGATION IMPLEMENTATION CHECKLIST <br /> CEQA section 21081.6 of the Public Resources Code requires all public agencies to adopt <br /> reporting or monitoring programs when they approve projects subject to environmental impact <br /> reports (EIRs) or mitigated negative declarations (MNDs). Accordingly, a mitigation monitoring <br /> checklist for implementation of the mitigation measures ident'rfied in Finai EIR for the project— <br /> i.e., for the selected Marina Shores Village Project Altemative 6'—is attached hereto. <br /> Most of the environmental mitigation measures that have been recommended for this <br /> alternative in the Final F.IR are implementable and subject to effective monitoring through the <br /> City's normal general plan amendment, rezoning, subdivision, grading, site and design <br /> (architectural) review, and building permi4 approval procedures, as well as during associated <br /> plan check and field inspection procedures. However, to satisfy CEQA section 21081.6, a <br /> documented record of implementation will be necessary. <br /> To meet this monitoring requirement, the attached checklist includes spaces for identifying: <br /> (1) each mitigation measure identified in the Final EIR; (2) the party responsible for <br /> implementing that mitigation measure and any related requirements with respect to the timing <br /> of implementation; and (3) the party responsible for performing mitigation monitoring, and <br /> (4) information on the type and required timing implications of the monitoring procedures. ' <br /> A verification column is also provided for the signature and date of the `monitoring and <br /> verification" entity when a monitoring milestone is reached. <br /> 2. FUTURE CHANGES IN THE PROJECT OR PROJECT CIRCUMSTANCES <br /> The project applicant anticipates that the project will be developed over a period of ten or more <br /> years. Over that time period, changes n �ay occur in the project or the circumstances under <br /> which the project is undertaken which require revisions to the EIR impact or mitigation findings. <br /> For example, changes may occur in the project site plan, floor area breakdown, number of <br /> residential units, residential density, commercial floor area, floor area ratio, number of hotel <br /> 'Alternative 6: Residential/Commercial–Same Residential, Reduced Commercial, with Reduced <br /> — Building Heights, Reduced Marina Fill, Added 200-Room Hotel and Increased Retail, Plus Transit and <br /> TDM Provisions. <br /> WP9.OI6451 M?• IMP-CHKLST.60.5 <br />