Laserfiche WebLink
Marine Shores Village Project Fnal EIR <br /> Cily of Redwood CitY _ Mitl9ation MonROring Checklist <br /> May 1 B. 2004 Page 2 <br /> ���� <br /> � rooms, other hotel characteristics, building heights, building seffiacks, building coverage, <br /> number of buildings, building architecture, parking provisions, intemai circulation, Vail <br /> nrovisions, grading, number of marina siips, :narina configuration and fill �haracteristics, <br /> infrastructure provisions, etc. ' <br /> If the City detertnines that such project description changes or changes in the project ' <br /> circumstances do not require major revisions to the certified EIR due to the involvement of new <br /> significant environmental effects, or a substantial increase in the severity of one or more EIR- <br /> identified significant effects the City shall prepare an Addendum to the E/R, pursuant to <br /> CEQA Guidelines section 15164, briefly describing the project changes and this determination. <br /> If the City determines that such project description changes or changes in the project <br /> circumstances do require major revisions to the certified EIR due to the involvement of new <br /> significant environmental effects or a substantiai increase in the severity of one or more EIR-� <br /> identified significant effects, the City shall prepare a Subsequent EIR or Supplement to the <br /> E/R pursuant to CEQA Guidelines sections 15162 or 15163, respectively. <br /> 3. FUTURE CHANGES IN MITIGATIONS <br /> Over the anticipated ten or more years uf project implementation, altematives or revisions to <br /> `.�� EIR-identified mitigations may be identified for EIR-identified significant environmental effects. <br /> If the City determines that the identified alternative or revised mftigation measure represents a <br /> measure which was previously found to be infeasible or is otherwise considerably different <br /> from the measure analyzed in the certified EIR, but would nevertheless adequately mitigate <br /> one or more EIR-identified significant effects of the project, and is aareed uoon by the project <br /> proponent (i.e., incorporated into the project), the City shall prepare an Addendum to the EIR, <br /> pursuant to CEQA Guidelines section 15164, briefly describing the mitigation change and this <br /> determination. <br /> If the City determines that a mitigation measure previously found not to be feasible would in <br /> fact be feasible or is otherwise considerably different from the measure analyzed in the <br /> certified Final EIR, but would nevertheless adequately mitigate one or more EIR-identified <br /> significant effects of the projeci, but is not agreed u�on by the project proponent (i.e., the <br /> project proponent declines to adopt the revised mitigation measure), the City shall prepare a <br /> supplement to the E/R, or a subsequen:' E/R, describi�g (requiring) the change, pursuant to <br /> CEQA Guidelines sections 15163 or 15162, respectively. <br /> WP9.016451 MIT•IMP-CHKLST.645 <br />