Laserfiche WebLink
�•�� <br /> �� . General Plan Amendments (Land Use Map and Text) <br /> . Zoning Map Amendments <br /> . Precise Plan <br /> . Development Agreement <br /> Copies of the Precise Plan, Environmentai Impact Report, and Developmen` Agreement <br /> were all sent to the City Council under separate cover on April 29, 2004. The Precise <br /> Plan is the principal planning document which both sets new zoning standards and a <br /> development "envelope" to reflect certain urban design objectives. it also lists the <br /> project conditions. Please refer to that document for more information. <br /> Key Planning Issues <br /> As mentioned previously, the Planning Commission recommended approval of certain <br /> entitlements which will result in the approval of the MSV Project. In its decision, the <br /> Planning Commission considered tha following key planning issues. These included <br /> tra�c and transportation, building height, urban design, density, water and sewer, and <br /> schools impacts. Each is discussed below (the Precise Plan page numbers are <br /> indicated in parenthesis for easy reference): <br /> 1. Tra�c and Transaortation. MSV is located in an area currendy isolated from the <br /> City's primary roadway system and from readily available transit opportunities. The <br /> projecYs EIR ident�ed about two dozen significant traffic impacts resulting from the <br /> development, either at Iocal intersections or along stretches of Hwy. 101. Some of <br /> these impacts may be mitigated by proposed improvements, but many others will <br /> remain significant even after required improvements are in place. Staff <br /> recommended to the Planning Commission, and the Commission agreed that an <br /> exemplary traffic and transportation program must be incorporated in the Precise <br /> Plan, along with a land use mix that encourages non-auto trips intemal to the <br /> project. <br /> Chapter III of the Precise Plan identifies e�ensive traffic and transportation <br /> improvements that are necessary to minimize the impact of the development and to <br /> enhance linkages from the area to the rest of the Bayfront area and to downtown <br /> (pgs. 67 - 71). These requirements include off-site capital improvements, <br /> provisions for transit, and Transportation Demand Management (TDM) measures. <br /> Each are summarized below: <br /> a. Caaital Imarovements. A number of required capital improvements are <br /> listed in the Precise Plan (pg. 71). These include off-site roadway <br /> improvements, a pedestrian-bicycle under-crossing of Hwy. 101, and <br /> various signalization improvements. The most substantial and significant of <br /> these are: <br /> (1) Blomauist Street Extension — Blomquist Street would be extended from <br /> Maple Street northwest past Docktown and over Redwood Creek to <br /> link to Bair Island Road and East Bayshore Drive at the project site. <br /> 2 <br />